Roof leaking? What to check before the monsoon, and how to stop it
Mr Mustafaa, Paint Engineer · checked against UltraTech's Weather Pro brochure, 12 Nov 2026
The short answer
Check in the dry months
Chalk every fault
Fix each one its own way
Coat the whole roof only if it has failed
A flat roof in Bihar leaks at the same eight places, and most of them are not cracks. Find them on a dry roof, any time from October to May, and repair each one. A coating over an unrepaired roof, or a coat put on in the rain, does not last. Finish everything by the end of May.
8
Places to checkKhurra, parapet joint, cracks, low spots, pipes, tank base, sariya, mumty door.
10–15 Jun
Normal monsoon onsetFor Bihar, as the Met office gives it. Plan to finish two weeks before.
2 coats
Of Hi-Flex, if the roof needs itAt least 8 hours apart, crosswise, then a screed over it (UltraTech).
The far parapet is drawn behind the roof so the khurra shows. The patch on the ceiling is often a little away from the point where water gets in.
When to do it
A roof is mended in the dry months, not in the rain
Most people climb up only when the ceiling drips. By then nothing can be done properly. Three reasons to go up now.
1Coatings need a dry roof
Hi-Flex, repair mortar and screed all have to grip clean, dry concrete. On a wet roof the coat does not bond, and the money is gone with the next rain.
2The faults show best now
In October and November the stains from the rains are still on the ceiling, so you know where to look. By April the long heat has opened the hairline cracks wide enough to see.
3The full job takes two weeks
Repairs have to cure, the two Hi-Flex coats need at least 8 hours between them, and a screed is kept damp for about a week. That needs a run of dry days, which June cannot promise.
The Met office gives 10 to 15 June as the normal date the monsoon reaches Bihar. Count back two weeks of work and a little spare: the last safe start is mid-May. What else to do that month is on the April page.
The roof year in north Bihar
Two good windows, one last call
October and November are the best time to find leaks. The rains have just ended, the roof dries fast, and every stain on the ceiling is a map of where water got in this year. Walk the roof now, chalk the faults, and do the repairs while you remember them.
December and January are workable, with care. North Bihar mornings are foggy and the roof is wet with dew until late morning. Start after the surface feels dry and stop before evening, so nothing is laid on a damp slab.
February to May is the main season. Most people get the whole job done in March or April. In May the roof is very hot in the afternoon; work in the morning and keep the fresh mortar damp.
June to September, leave the coating alone. If it leaks, patch it for now (emergency steps), keep the khurras clear, and mark every new stain with a pencil date. Those marks are your October list.
The roof check · one morning
Walk the roof in this order and chalk what you find
Take a broom, a bucket or hose, white chalk, a screwdriver and your phone. Sweep first: you cannot see a crack under dust and leaves. Then wet the roof lightly and wait half an hour. Cracks stay dark longest, and the low spots keep their water.
BroomBucket or hoseWhite chalkScrewdriverPhone camera
Your roof after the check
1
Khurra (outlet)
Look: leaves, mud, a plastic bag, a mouth that sits higher than the roof. Test: pour a bucket near it. It should run away in a clear stream.
Look: along the foot of every parapet and the mumty wall: a hairline gap, white powder, black lines. Test: scratch with a screwdriver; loose mortar means open joint.
Also rub the old coating, if there is one, with your palm. Powder on the hand, flakes, or bare patches mean it has worn out: see whole roof or not. Then go downstairs and photograph every ceiling stain. Send the photos with your chalk marks to us on WhatsApp if you want a second look.
The fix, fault by fault
Each fault has its own repair
These are spot repairs. Do every one you chalked, on a dry roof, before any coating goes on the whole roof. In the drawings the layers are drawn much thicker than they are.
SBR slurry (bond coat)Mortar with WP+200Hi-Flex coatWater
1 · Khurra blocked or set high
You see: water standing in the corner
Clear it and pour a bucket. If it drains, you are done.
If water stands at the mouth, chip around it and reset the mouth a little lower than the roof, in mortar with WP+200 (200 ml per 50 kg bag of cement).
Take the Hi-Flex coat into the mouth and fit a grating.
One khurra for a big roof is a common cause of standing water. How many a roof needs: roof drainage.
2 · Parapet joint open
You see: stains along the wall edge of the ceiling
Rake out loose mortar along the joint and brush it clean.
Brush on SBR slurry, then build a rounded gola (fillet) of mortar with WP+200 in the corner, about a palm wide (usual practice).
When it has cured, coat Hi-Flex from about a foot out on the roof to at least a foot up the wall.
Do the mumty walls the same way. Parapet top and cracks in its plaster: parapet waterproofing.
3 · Hairline cracks
You see: a straight-line stain on the ceiling
Open each crack into a small V with a chisel and blow the dust out.
Brush SBR slurry into the groove and fill it with mortar made with WP+200, while the slurry is still tacky.
Keep it damp for a few days, then coat a strip of Hi-Flex over it, two coats.
A crack you can put a coin edge into, or one that has grown since last year, needs a look first: structural or minor?
4 · Low spots and standing water
You see: a round patch that grows after rain
Clean the area, brush on SBR slurry so the new layer sticks to the old slab.
Lay cement mortar with WP+200, sloped so water runs to the khurra. A fall of about 1 inch in every 8 feet is usual practice.
Keep it damp, then test with a bucket: nothing should stand after an hour.
No coating survives water that stands on it for days. This is the step people skip most.
5 · Pipes through the slab
You see: a patch around a pipe on the ceiling
Rake out the loose ring around the pipe.
Brush SBR slurry on the pipe and the concrete, then pack a sloping cone collar of mortar with WP+200, so water runs away from the pipe.
Coat Hi-Flex over the collar and a little way up the pipe.
Same for dish antenna stands, solar frames and old tent-peg holes from a wedding shamiana.
6 · Tank platform
You see: a patch under the tank, wet all year
Fix any leaking tank fitting first, or the patch never dries.
Make a small gola of mortar with WP+200 all round the platform base, then coat Hi-Flex up its sides and onto the roof.
Run the overflow pipe to the khurra, not onto the roof.
Old coat powdery or peeling, many cracks, standing water, or leaks in several rooms
All repairsHi-Flex × 2Screed
All repairs and slope first.
Two coats of Hi-Flex over the whole roof and up the walls.
A screed over it, as UltraTech recommends. The order and waits are below.
A coat is a skin. On a roof that still holds water or has open cracks, it fails in a season or two.
The whole roof, layer by layer
Coat thickness, gap and the screed come from UltraTech's Weather Pro brochure. Gola size, the height up the wall and screed mix are usual practice.
Step
Wait
1 · All spot repairsSBR slurry, then mortar with WP+200 at 200 ml per 50 kg bag of cement (UltraTech). Slope fixed.
few days damp
2 · Gola at every wallParapets and mumty, same mortar, rounded.
cured
3 · Hi-Flex coat 1Mix the powder and liquid together. 0.6–0.7 mm thick, up the walls at least 1 ft.
≥ 8 h
4 · Hi-Flex coat 2At right angles to coat 1 (UltraTech).
dry, per pack
5 · Screed on topUltraTech "highly recommends" a screed or plaster over the coat. Usual practice: 1:4 cement-sand, about 20 mm, WP+200 in the water, sloped to the khurras.
7 days damp
Count about two weeks of dry days.
Never coat a damp roof or just before rain. In May, coat in the early morning, not on a slab too hot to touch. If the roof will be used for drying grain or for functions, the screed matters even more: feet and sun wear a bare coat away. Step-by-step method for a new or existing roof: terrace waterproofing and roof waterproofing in the house-building guide.
How much to buy
Hi-Flex, cement and WP+200 for your roof
Put in the roof size inside the parapet. Hi-Flex uses the safe reading of UltraTech's figure (see the note under the list), so you will not run short halfway.
Your list
Weather Pro Hi-Flex, 2 coats—1 kg covers 14–15 sq ft per coat (UltraTech), so two coats take double—
Seal & Dry SBR, for repairsby repairsDepends on how many cracks and joints you chalked. Mix it with cement as printed on the pack.Start with 1 kg · Ask rate
Why double: UltraTech's brochure gives 14–15 sq ft per kg and 0.6–0.7 mm a coat, without saying whether the area is for one coat or both. One coat is the only reading that fits that thickness, so we count two coats as double. Prices fill in from today's rate. Tank, bathroom or wall: waterproofing calculator.
On our shelf for this job
What each product does on a roof
Coating
Prices are from our latest bill and change often. Please confirm today's rate on WhatsApp or call before buying.
Any other pack size or brand you need, we can order for you; ask on WhatsApp for the time it takes. Today's price for every pack: waterproofing rates. Need someone to do the work: waterproofing applicators we know.
Questions people ask us
Short answers
How do I stop water dripping from the roof for good? (chhat se pani tapakna kaise roke)
Find every place the water gets in, using the eight checks above, and fix each one on a dry roof. If the old surface has failed, then give the whole roof two coats of Hi-Flex and a screed over it. A coat over unrepaired faults does not last.
What should I check on the roof before the rains?
Sweep, pour water at each khurra, walk the parapet joint, wet the roof and chalk the cracks and the spots where water stays, then check the pipes, the tank platform, any sariya sticking up and the mumty door step. Downstairs, photograph every ceiling stain.
When should roof waterproofing be done in Bihar?
Any time from October to May, on a dry roof. October and November are best for finding leaks; April and May are the last call. The monsoon normally reaches Bihar around 10 to 15 June, and the full job needs about two weeks of dry days, so finish by the end of May.
Can it be done now, in winter?
Yes, on dry days. Wait until the dew and fog have gone and the surface is dry to the touch, usually by late morning, and stop before the evening damp. Do not coat a slab that feels cold and wet.
What is the treatment for leakage in an old roof? (purani chhat ki leakage)
Repair first: cracks, parapet joint, slope, pipes, khurra. If the old coating is powdery or peeling, or water comes in at many places, coat the whole roof with two coats of Hi-Flex laid crosswise and put a screed over it, as UltraTech's brochure recommends.
Does filling the cracks alone stop the leak?
Only if the cracks were the only fault. On most Bihar roofs we also find an open parapet joint, a blocked khurra or a low spot where water stands. Check all eight.
Which waterproofing chemical is best for a roof?
Each one does a different job. A flexible coating like Weather Pro Hi-Flex goes on top. WP+200 is not a coating: it goes in the water of the repair mortar and screed, 200 ml per 50 kg bag. Seal & Dry SBR makes the bond coat so new mortar sticks to the old slab. People who ask for "Dr. Fixit Roofseal" are asking for a flexible roof coating; the one we sell is Hi-Flex.
How much Hi-Flex for a 1000 sq ft roof?
UltraTech says 1 kg covers 14–15 sq ft at 0.6–0.7 mm a coat. We read that as one coat, so two coats on 1000 sq ft take about 134 to 143 kg, plus the strip up the parapet. Buy for the higher figure. The calculator above does it for your size.
How long will it last?
Contractors commonly quote 5 to 15 years for roof waterproofing; that is an industry estimate, not a promise. A coat under a screed, on a roof that drains, lasts at the long end. A bare coat in sun on a roof that holds water lasts at the short end. Check it every October either way.
Mr Mustafaa
Paint Engineer, Tashya Ventures
Paint Engineer at our Reva Road store, Muzaffarpur, and the person to ask about waterproofing. The product figures on this page were checked against UltraTech's own Weather Pro brochure on 12 Nov 2026. Where the brochure is unclear, the page says so and gives the safer figure. Figures marked "usual practice" are common site practice, not a maker's figure.
Where the numbers come from
UltraTech, Weather Pro waterproofing brochure: WP+200 at 200 ml per 50 kg bag, mixed into half the water; packs 200 ml to 100 L. Hi-Flex: powder and liquid mixed, 0.6–0.7 mm a coat, two coats at least 8 hours apart, the second at right angles, 1 kg covers 14–15 sq ft, screed or plaster over it "highly recommended", up to 100% elongation (ASTM D 412), packs 12 and 24 kg.
India Met Department, as reported by PTI (India TV News): normal date of monsoon arrival in Bihar, 10–15 June.
Usual practice, labelled where used: gola about a palm wide, coating at least 1 ft up the wall, fall of about 1 inch per 8 ft, screed 1:4 about 20 mm, 7 days damp curing. Screed cement worked out at 1.33 dry volume, 1,440 kg per m³ of cement.
Service life 5–15 years: commonly quoted by contractors, not a maker's warranty.
Send us a photo of your roof
With the roof size and your chalk marks. We'll tell you which fixes it needs and send the list with today's price on WhatsApp.