Sand, stone chips, bricks · Muzaffarpur

Balu, gitti and eent in Muzaffarpur: which one, how it is measured, and when to buy

The short answer
  • Balu: by the cft, quoted by the trolley (about 100 cft). Lal balu for dhalai, concrete and plaster; local balu for filling.
  • Gitti: by the cft. 20 mm for slab, beam and column; 40 mm for PCC; 10 mm for thin work.
  • Eent: quoted per 1,000, billed per piece. Awal for outside and load-bearing walls; doyam for inside walls.

Rates are set at the store each morning and sit on one board. Delivery is charged separately, by distance. Measure the trolley before you pay.

~100 cft
One tractor trolleyUsual practice. It is also 1 brass. Loads differ, so measure.
15 Jun
River sand stopsMining is closed until 15 October. Balu climbs in the weeks before.
5%
GST on balu and gittiBricks are taxed differently: see the box below.
Where each one goes in a house
Ground 1 2 3 3 4 5 Slab and beamsColumnsFloor fillingPCC under footing Brick wall, then plaster on both faces
  1. 1PCC under footing and floor: 40 mm gitti, lal balu, cement
  2. 2Floor filling: local balu
  3. 3Slab, beam, column: 20 mm gitti, lal balu, cement, steel
  4. 4Wall that carries load or faces outside: awal eent
  5. 5Plaster: clean, sieved lal balu and cement
Three materials, three jobs

What each one is, and which kind to ask for

All three can come on the same trip as your cement: one order, one GST bill.

Lal baluLocal balucoarsefine

Balu (sand)

Mixed with cement for concrete, plaster and mortar. Also fills under floors.
  • Lal balu: coarse, reddish, gritty between the fingers. Dhalai, columns, beams, PCC, and plaster once sieved. In UP the coarse sand is called morang; same job.
  • Local balu: fine and pale, from nearby rivers. For filling under floors. Some masons put it in brickwork mortar. Never use it alone in concrete.
  • Plaster wants sand without clay. Sieve it on site (usual practice in North Bihar).
Sold by the cft. Quoted by the trolley. GST 5%.
10 mm20 mm40 mm thin workslab, beam, columnPCC

Gitti (stone chips)

Crushed rock: the stone in every slab, beam, column and PCC floor.
  • 20 mm: roof slab, beams, columns, lintels. IS 456 says 20 mm suits most reinforced concrete.
  • 40 mm: plain concrete under footings and floors, where there are no bars to get past.
  • 10 mm: thin sections and small precast work such as covers and jaali. Often mixed with 20 mm.
  • Good gitti is angular and clean with few flat, flaky pieces. Dust and clay weaken concrete. Sizes follow IS 383.
Sold by the cft. GST 5%. No river ban applies.
AwalDoyamJhama even, sharppatchy, chippeddark, bent

Eent (red clay bricks)

For walls. The class decides where a brick can go.
  • Awal (first class): even red colour, sharp straight edges, clear ring when struck. Outside walls and walls that carry the roof.
  • Doyam (second class): patchy colour, some chipped corners. Inside partitions and boundary walls that will be plastered.
  • Jhama: over-burnt, dark, often bent. Used broken for soling under floors.
  • Size: IS 1077 gives a modular brick of 190 × 90 × 90 mm; older kiln bricks are about 9 × 4½ × 3 inch. Sizes vary by kiln, so measure a few from the stack.
Quoted per 1,000. Billed per piece. Class names are local usage.
Measure and bill

How each is measured, quoted and billed

One trolley, measured
Length 10 ftWidth 5 ft Height 2 ft 1 brass 10 × 5 × 2 = 100 cft A usual tractor trolley, levelled. Measure yours.
Inside the walls, in feet. If the heap is rounded, level it, or take the height at the four corners and the middle and use the average. A truck is measured the same way. 100 cft is 1 brass; 1 m³ is 35.3 cft.
MaterialCounted inQuoted asGST
Balucftper trolley and per cftBilled per cft5%
Gitticftper cft"Per tractor" means: measure the trolley, multiply by the per-cft rate5%
Eentpiecesper 1,000Billed per piece12% or 6%
Bricks and GST. After the September 2025 GST changes, bricks stayed under a special scheme: 12%, or 6% when the kiln takes no input credit (Business Standard, 18 Sep 2025). Some sites list 5% for bricks outside the scheme; the makers of those lists disagree, so budget for 12%. The rate that applies is printed on your bill.
Delivery is charged separately, by distance. Ask for the amount for your site: delivery and transport. How a trolley is counted, with tractor and truck: cft in a trolley.
Why the rate moves

The calendar sets the price

One year, three materials
JanFebMarAprMayJunJulAugSepOctNovDec normal Buy balu nowprice climbs River sandmining stoppedold stock only normal Quarry stoneno river ban;diesel and roads kilns firing Kilns stop;sold from stack kilns firing BaluGittiEent
Ban dates: 15 June to 15 October. Kiln months are usual practice; kilns differ.

Balu comes out of rivers

River sand mining in Bihar stops every year from 15 June to 15 October. Only stock already lifted can be sold. In May 2026 Patna Press reported a 100 cft trolley going from Rs 5,000 to 5,500 up to Rs 7,000 to 8,000 in about 15 days.

Gitti comes from quarries

Crushed rock is not river material, so the ban does not stop it. When sand jumped in May 2026, traders told Patna Press gitti had stayed steady. Diesel, distance and rains move it.

Eent comes from kilns

Kilns mould and fire in the dry months. In the rains they usually stop and bricks are sold from the stack. If you plan to build walls in the monsoon, book bricks before it.

Building after June? Buy the sand for your slab and plaster in April or May and stack it on a raised, covered spot so rain does not wash out the fine part. More: the yearly mining ban and today's rate.

Match the material to the job

Which one goes where

WorkAsk forWhy
PCC under footings and floors40 mm gitti, lal baluNo bars to get past, so the big stone is fine
Slab, beam, column, lintel20 mm gitti, lal baluReinforced concrete: IS 456 allows 20 mm for most of it
Thin precast: covers, jaali10 mm gittiSmall sections need small stone
PlasterClean lal balu, sievedClay in the sand weakens the plaster
Filling under a floorLocal baluFine sand packs well and costs no strength
Outside and load-bearing wallsAwal eentEven burning, straight edges, lays true
Inside partitions, boundary wallsDoyam eentThey get plastered anyway
Soling under floorsBroken jhamaHard enough for a base layer

Work out the quantity first, then ask for the rate

Ordering by the trolley without a number is how sites end up with heaps left over, or a slab stopped halfway for one more load.

At your site, before you pay

Four checks, with the driver still there

If something is wrong, it goes back on the same trolley.

Tape the inside length × width × height

1 · Quantity

Measure the trolley

Length, width and load height inside the walls. A load well short of what you paid for goes back or gets topped up.

e-challan

2 · Paper

Ask for the e-challan

In Bihar every load of sand on the road needs one from the Mines and Geology Department. Check the number or QR on Khanan Soft. Sand without one can be seized.

mud layer not above 8% sand mud

3 · Sand

Jar test for mud

Fill a jar with sand and water, shake, leave. If the mud layer on top is more than about 8% of the sand below, wash it or send it back.

Strike two together clear ring = well burnt

4 · Bricks

Ring, scratch, soak

A ring when two are struck means well burnt; a thud means under-burnt. For a big order, soak one for a day: IS 1077 allows no more than 20% weight gain in common bricks.

More: checking brick quality.

Questions people ask us

Short answers

What is the balu rate in Muzaffarpur today?

It is on the Tashya rate board, per cft and per trolley, with the date it was set. The store sets it each morning. For the final amount with delivery to your village or mohalla, send your location on WhatsApp.

How many cft in one trolley of balu?

A tractor trolley load is usually about 100 cft, which is also 1 brass. Trolleys are not all one size, so measure inside the walls: length × width × height in feet, after levelling the heap. This is usual practice, and Patna Press also describes a trolley load as around 100 cubic feet.

Why does balu cost more before June?

River sand mining in Bihar stops every year from 15 June to 15 October. Builders stock up in the weeks before and the rate climbs. In May 2026 Patna Press reported a 100 cft trolley going from Rs 5,000 to 5,500 up to Rs 7,000 to 8,000 in about 15 days. Buy the sand for slab and plaster in April or May.

Does gitti also stop in the rains?

No. Gitti is crushed quarry stone, not river material, so the river ban does not apply to it. Its rate moves with diesel, distance from the crusher and road conditions.

Is GST charged on balu, gitti and eent?

Yes. Sand and stone chips carry 5%. Bricks stayed under a special scheme after the September 2025 GST changes: 12%, or 6% when the kiln takes no input credit. Some websites list 5% for bricks, so budget for 12%. The bill shows the rate that applies.

Awal or doyam: which eent should I buy?

Awal for outside walls and walls that carry the roof. Doyam can go in inside partitions and boundary walls that will be plastered. Check a few from the stack: clear ring, sharp edges, even colour.

Arun Tiwari
Experienced thekedar, Tashya Ventures

Thekedar at our Reva Road store, Muzaffarpur, for costs, site questions and local supply. The figures on this page come from the sources below. Where a figure is usual site practice, the page says so, and where sources disagree it gives the safer one.

Where the numbers come from

  1. Patna Press, Bihar sees sharp rise in sand, cement and aluminium prices (18 May 2026): trolley "around 100 cubic feet", Rs 5,000 to 5,500 up to Rs 7,000 to 8,000 in about 15 days, gitti steady, ban 15 June to 15 October.
  2. Patna Press, monsoon sand mining ban, 2026, and Down To Earth, sand mining ban extended till 15 October in Bihar (2023): yearly ban on river ghats, now 15 June to 15 October.
  3. Bihar Minerals (Concession, Prevention of Illegal Mining, Transportation and Storage) Rules, 2019: sand moves under e-challan. Verification: Khanan Soft, Mines and Geology Department, Bihar.
  4. Business Standard, Bricks to continue under GST 2.0 special composition scheme at 12% (18 Sep 2025); GST Council FAQ summary, CAalley GST 2.0 FAQ (bricks 6% without credit, 12% with). Sand (HSN 2505) and crushed stone (HSN 2517) at 5%: Tally HSN and GST guide.
  5. Bureau of Indian Standards: IS 456:2000 (20 mm aggregate for most reinforced concrete), IS 383:2016 (10, 20 and 40 mm graded aggregate), IS 1077:1992 (common burnt clay bricks: modular size, water absorption not above 20% for common classes).
  6. Trolley size, the jar, ring and scratch tests, brick class names and kiln months: usual site practice in North Bihar, labelled as such on the page.

Send us your site and what you are building

We will send back today's final rate for balu, gitti and eent with delivery, on WhatsApp.