Balu is billed by the cft and quoted by the trolley. A tractor trolley is usually about 100 cft, but trolleys differ, so measure yours: length × width × level height, in feet. A trolley price means nothing until you know its cft. Always ask for the rate per cft.

~100 cft
One trolleyAbout 2.83 m³. Usual practice; yours may be more or less.
5%
GST on sandShown on your bill, with the rate and the cft.
15 Jun
River sand closesNo new mining until 15 October. Rates climb in the weeks before.

Today's rate: Ask rate per cft. The board is updated every morning: balu, gitti, eent rate.

One trolley, measured
A tractor trolley of balu as a box of 8 by 5 by 2.5 feet A trolley filled level with sand is a box. Length 8 feet, width 5 feet, height 2.5 feet. Multiply them: 8 times 5 times 2.5 equals 100 cubic feet, which is about 2.83 cubic metres. LENGTH 8 ft HEIGHT 2½ ft WIDTH 5 ft 8 × 5 × 2½ = 100 cft = 2.83 m³ · 1 m³ = 35.3 cft Example size, filled level to the top rail
A trolley is a measure of volume, not weight. This example box is 100 cft; your trolley may be longer, shorter or shallower, which is why the rate per cft is what you compare.
Which balu

Coarse sand for strength, fine sand for filling

Dealers name sand by colour, by river or by the place it comes from. The names change from yard to yard. What matters is the grain, so look at it and rub it between your fingers.

The two grains, drawn large
Coarse lal balu next to fine local balu Two squares of sand under magnification. Lal balu has large, separate, reddish grains. Local balu has very small pale grains packed close. Lal baluLocal balu coarse, reddish, grittyfine, pale, soft
Not to scale. Rub a pinch between finger and thumb: lal balu feels gritty, local balu feels like flour with a little grain.

Lal balu

Coarse, reddish · stocked
  • Dhalai, beams, columns and any concrete with cement and gitti
  • Plaster, when it is cleaned and sieved
  • Which one for plaster and which for dhalai: kaun si balu

Local balu

Fine, pale, from nearby rivers · stocked
  • Filling under floors and plinth
  • Brick mortar, where the mix does not carry load
  • Not for slab or column concrete

Morang balu

Coarse sand, sold under this name in the north
  • Does the same job as lal balu; dealers use the two names loosely
  • We can order it for you. Ask on WhatsApp for the time it takes.

If you want the standard's numbers

The Indian standard for sand, IS 383, sorts natural sand into four zones by how much passes a 600-micron sieve. A thekedar or engineer may quote a zone.

ZonePasses 600 micronFeels like
Zone I15–34%Very coarse
Zone II35–59%Coarse to mediumThe usual choice for concrete
Zone III60–79%Medium to fine
Zone IV80–100%FineSmoother plaster

Sources disagree a little on which zone suits plaster: some name Zone II, others say the finer Zone III or IV gives a smoother wall. We go with coarse-to-medium for concrete and finer for plaster.

Why the rate jumps

River sand stops on 15 June. Order before it does.

Bihar sand year: mining closed 15 June to 15 October A twelve-month bar. River sand mining is closed from 15 June to 15 October. In May 2026 a trolley of about 100 cft rose from Rs 5,000-5,500 to Rs 7,000-8,000 in about 15 days. January to April is the quieter time to order. JFMAMJJASOND MINING CLOSED 15 Jun 15 Oct MAY 2026, ABOUT 15 DAYS ₹5,000–5,500 → ₹7,000–8,000 per trolley of ~100 cft, Patna Press report, 18 May 2026 Quieter weeks order and stack Stock-only months dug before the ban Sand sold in June–October comes from earlier stock

Every year, river sand mining in Bihar is closed from 15 June to 15 October for the monsoon. Sand sold in those months was dug and stacked earlier, and the stack runs down as the rains go on.

Builders know this, so they buy early. Patna Press reported that in about 15 days to mid-May 2026 a trolley of about 100 cft went from ₹5,000–5,500 to ₹7,000–8,000 in several areas. That is a Patna-region price from the press, not ours; our rate is on the board.

What to do: if your dhalai, plaster or filling falls between June and October, order in April or early May and stack the sand on a clean, dry spot. Keep it off mud and cover it before heavy rain. Cement can wait for dhalai week; sand is the one to book early.

More on this: the June–October sand ban. For how much to book: cement, sand, gitti calculator.

Check before you pay

Three checks at the trolley, five minutes in all

Do them before the load is unloaded. A short trolley, wet sand or muddy sand all cost money and cannot be fixed after it is in the heap.

L × W × H, inside

1. Measure the trolley

Inside length × width × level height

In feet. Height is to the level top of the sand, not the peak of a heap. 100 cft is the usual count; a lower number is a shorter load, and you should pay per cft. Use the calculator below.

drywet → same sand, more room

2. Squeeze a handful

It holds its shape and wets your palm: too wet

Damp sand swells, which engineers call bulking. Sources give 15–30% extra volume at about 4% moisture, depending on the grain. So a wet trolley holds less real sand than the cft says. After rain, ask for a lower rate, or take the load later.

silt: thinsandwater wait 2 h

3. Jar test for mud

Mud in sand weakens plaster and concrete

Put a few cm of sand in a clear bottle, fill with water, shake, leave for about two hours. The pale mud that settles on top of the sand should be a thin line. A usual field rule is under one-tenth of the sand's depth. IS 383 caps fine dust in natural sand at 3% by weight.

Measure your trolley

How many cft did you really get, and what is the rate per cft?

Put in the inside size of the trolley and the price you were quoted. We work out the cft and the rate per cft, so two dealers can be compared fairly.

Inside size, with the sand filled level. If the load is heaped, measure to the level of the sides and treat the heap as a bonus.

Your trolley

One trolley—Compared with the usual 100 cft
All trolleys—In cubic metres
Rate per cft you were quoted—Price per trolley ÷ cft per trolley. Compare dealers on this number.
Ask for this quantity on WhatsApp

Our rate is per cft, with GST 5% on the bill. Today's rate: rate board. How much sand your job needs: balu and gitti per 1,000 sq ft.

On our shelf

Our balu, and what goes on the same trip

One order, one trolley or truck, one GST bill. Delivery is charged separately, by distance: delivery and transport.

To order: send the site's location, the sand you want and the cft or number of trolleys. We reply with today's rate, the delivery charge for your site, and the time. We sell genuine material with a GST bill.

Questions people ask us

Short answers

What is the balu rate in Muzaffarpur today? (balu ka rate)

The rate is set at our store each morning and moves with supply and transport. It is on the board per cft and per trolley: balu, gitti, eent rate. Ask for the rate per cft, because trolleys are not all the same size.

How many cft is one trolley of balu?

A tractor trolley is usually counted as about 100 cft (2.83 m³), for example 8 ft × 5 ft × 2½ ft inside. That is usual practice, not a rule. Measure length × width × level height in feet. The calculator above does the sum.

What is the balu rate per tractor? (per tractor balu ka rate)

A tractor load is one trolley. Divide the trolley price by that trolley's real cft to get the rate per cft, and compare dealers on that figure, not on the trolley price.

What is the rate for one truck of balu? (1 truck balu ka rate)

Trucks differ more than trolleys, and a truck can mean anything from a few trolleys to many. Measure the inside of the body in feet (length × width × height), divide by 100 to see how many trolleys it equals, and ask for the rate per cft. Delivery by truck is charged by distance.

Is the GST on balu 5%?

Yes. GST on sand is 5% and is shown on the bill.

Why does balu cost more before 15 June?

River sand mining in Bihar is closed from 15 June to 15 October each year, so builders rush to buy before it. Patna Press reported a trolley of about 100 cft rising from ₹5,000–5,500 to ₹7,000–8,000 in about 15 days before the 2026 ban. If your work falls in the rains, order in April or early May.

Is lal balu the same as morang balu?

They do the same job: coarse sand for concrete, dhalai and plaster. Dealers use the names loosely, so judge by the grain and ask which river it came from. We stock lal balu and can order morang balu.

Can I use local (fine) balu for dhalai?

Not for slab, beam or column concrete. Fine sand gives weaker concrete for the same cement. Use lal balu there, and keep local balu for filling and brick mortar. See which balu for plaster and dhalai.

How much balu do I need?

It depends on the job. The cement, sand and gitti calculator gives the quantity for slab, plaster or PCC, and balu and gitti per 1,000 sq ft gives a quick figure. Add a little for loss while stacking and mixing.

Arun Tiwari
Site and costs, Tashya Ventures

Arun works with thekedars and house owners on site at our Reva Road store, Muzaffarpur. The trolley sizes and checks here are the ones used on Bihar sites; the numbers from outside sources are named below.

Where the numbers come from

  1. Patna Press, Bihar sand, cement and aluminium price rise (18 May 2026): trolley of about 100 cft from ₹5,000–5,500 to ₹7,000–8,000 in about 15 days; mining stop 15 June to 15 October.
  2. IS 383 grading zones I to IV by percentage passing the 600-micron sieve, as tabulated in a college course module on IS 383; 3% fine-dust limit for natural sand as summarised from IS 383:2016. Sources vary on the best zone for plaster; check the standard for your job.
  3. Bulking of sand: The Constructor and Civil Blog: 15–30% extra volume at about 4% moisture; the figure depends on grading and the sources give slightly different tables.
  4. Store practice: trolley of about 100 cft, level-fill measuring, jar test for silt and the one-tenth field rule are usual practice. GST on sand 5% (the store's bills).

Tell us the cft you need

We'll send today's rate per cft, the delivery charge for your site and the time, on WhatsApp.

TASHYABUILDING SOLUTIONS · MUZAFFARPUR
WhatsApp 90310 74624tashyaventures.com