Soak pit: what it does after the septic tank, how it is built with bricks and gitti, and where to dig it
- Toilet
- Septic tank
- 110 mm pipe
- Soak pit
- Into the soil
A soak pit (sokhta) is a round pit lined with honeycomb brickwork, bricks laid with gaps, and backed with gitti. The settled water from the septic tank enters near the top and sinks out through the gaps into the ground. It only works if your soil drinks water and the ground water stays well below it after the rains. Check both before you dig.
The pit takes settled water, not toilet waste
The septic tank does the dirty work: the solids sink and rot in its chambers, and only the cleared water leaves by the outlet pipe. That water still has to go somewhere. In a house with no street sewer, which is most of Muzaffarpur district, it goes to a soak pit. How the tank itself is built is on how a septic tank is built, and its size on septic tank size for your house.
- ✓Septic tank outlet water. This is what the pit is for.
- ✓Bath, basin and clothes-washing water, through a gully trap and a small chamber, if there is no street nali to take it. See where bath and kitchen water goes.
- ✓Kitchen sink water, but only through a chamber that holds back oil. Cooking oil seals the soil around the pit faster than anything else.
- ✗Toilet water straight from the pan. Always through the septic tank first.
- ✗Roof rainwater. One monsoon downpour off a 1,000 sq ft roof is several thousand litres; it floods the pit and washes silt in. Give the roof its own pipe.
- ✗Sludge from emptying the tank, phenyl or acid by the bottle.
Every extra litre needs more pit wall. Bath and kitchen water is usually two to three times the toilet's share, so where a street nali will take it, send it there and keep the soak pit for the septic tank alone. The sizing tool below shows the difference.
Far from the boring, clear of the house, on the low side
- 118 m (60 ft) from any drinking-water source. Your boring, the neighbour's boring, a handpump, a well. IS 2470 (Part 2) sets this to keep the outflow out of the water you drink. Plan the boring and the pit together: opposite corners, and see where to put the boring.
- 26 m (20 ft) from the house. The same clause keeps it "as far from the nearest habitable building as economically feasible", and not closer than 6 m, so the wet ground does not soften your foundation. Count the neighbour's house too.
- 3On the low side of the plot, and where rain does not collect: surface runoff carries silt that chokes the gitti.
- 4Not under the driveway or a tree. Tractor or car wheels press the soil tight around the pit; roots grow into the gaps.
- 5Close enough to the septic tank for the 110 mm pipe to keep a steady fall all the way. The plumbing checklist uses 1 in 60, about an inch every five feet: see the plumbing stage checklist.
Plot too small for 18 m? Then a soak pit is the wrong answer for that plot. Take the septic tank outlet to the street drain if the Nagar Nigam or panchayat allows it, and ask your engineer about a sealed alternative. If you must have both, the boring should draw from deep down with its casing sealed (see casing pipe for boring), never a shallow handpump near the pit, and get the water tested.
Will your soil take the water? Is the ground water low enough?
These two decide whether a soak pit works on your plot at all. Both are free, and both are best done in September or October, when the ground is at its wettest. The code itself asks for the soil test in the wettest season.
- 1Dig a hole 10 to 30 cm across, as deep as the bottom of the pit you plan. Put 5 cm of gitti at the bottom.
- 2Soak it. Fill to 30 cm above the gitti and keep it topped up for at least 4 hours, overnight in clayey soil, so the soil is as wet as it gets in the monsoon. (The soaking time is usual practice.)
- 3Set the water 15 cm above the gitti, mark a stick, and watch it for 30 minutes.
- 4Work out the minutes for the water to fall 25 mm (one inch). That is your percolation rate.
| Minutes per 25 mm | Water the pit wall takes | What to build |
|---|---|---|
| 1–5 | 90–204 L per m² a day | Soak pit works well |
| 10–15 | 52–65 L per m² a day | Soak pit, a bigger one |
| 30 | 37 L per m² a day | Soak pit only for small flows |
| 30–60 | 26–37 L per m² a day | Dispersion trench, not a pit |
| over 60 | — | Soil can't absorb: ask an engineer |
Rates from IS 2470 (Part 2), Table 2; what to build from its Table 1. The rate counts the pit's side wall below the pipe, not the floor.
Check 2 · the ground water after the rains
A soak pit standing in ground water can't empty; it just fills up and backs up into the septic tank. IS 2470 says not to use a soak pit where ground water comes within 1.8 m (6 ft) of the surface; use a raised trench or another method instead.
Around Muzaffarpur this is the check that fails most often. The Central Ground Water Board's booklet for the district recorded water at 2.09 to 7.63 m below ground before the monsoon and 0.67 to 5.21 m after it. So the same plot can look fine in May and be waterlogged in October.
How to check: look at the water level in an open well or a pit nearby in September–October, or ask the borewell man what depth he hit water at in the rains. Leave at least 1.5 m (5 ft) of dry soil under the pit's floor at that time; more is better. If you can't, make the pit wider and shallower, or build two shallow pits, rather than one deep one. The flood-plinth page explains why the same high water also weakens foundations: plinth height in a flood area.
Six steps from digging to the cover
Dig round, a little wide
Dig the pit round, about 60 cm wider than the inside size: room for a 9-inch brick wall and the gitti behind it. A pit deeper than a man's height needs the sides stepped or shored while digging; loose silt falls in without warning.
Lay the honeycomb lining
From the floor up to about 15 cm below the pipe, lay bricks in a ring with open gaps, about half a brick, in every course, and the joints between them dry or only lightly bedded. The code calls this "dry open joints". Use well-burnt bricks; soft ones melt in wet soil. See checking bricks at the stack.
Pack gitti behind it
As the ring rises, fill the gap between the bricks and the soil with coarse gitti, at least 7.5 cm (IS 2470). It keeps soil from washing in through the gaps. Many masons also put a bed of gitti or brick bats on the floor so the falling water does not scour it.
Solid courses above the pipe
From just below the pipe to the top, lay the bricks in cement mortar, no gaps. The top stays firm for the cover and surface water can't pour in. Set the 110 mm pipe through this part so it sticks a few inches inside the pit.
Cover it, a little above ground
Finish the ring a few inches above the ground and close it with an RCC slab with a manhole lid, cast on site or precast. The raised edge stops rain and silt running in. Fill soil around it and slope it away.
Test before you close the floor
Before the house floor and tiles go in, pour a few buckets down the last chamber and watch them reach the pit. Then send photos of the pit before it is covered on WhatsApp and we will look at them with you.
Filled with gitti or left empty? IS 2470 shows two kinds. A pit lined with honeycomb brickwork can stay empty inside: it holds more water and can be cleaned. A pit dug without lining must be filled to the pipe with stone or brick bats, so the sides don't fall in. Filling a lined pit to the top with gitti is common, but it takes up about half the room and is harder to clean when it chokes.
How big a pit for your house, and what to buy
Put in your family, which water goes to the pit, your soil test and the October water depth. The tool works out the wall area the code asks for, the depth, and whether one pit is enough.
Working figures: 40 L a day per person for the toilet (about five flushes of a 6–9 L cistern) and 80 L more for bath, basin, clothes and kitchen. They are our planning figures, not a code figure; an Orissa pan with a mug uses less. Pipe assumed to enter 60 cm below ground.
Your soak pit
Wall area = water per day ÷ the soil's rate from IS 2470 (Part 2), Table 2. The tool keeps at least 1.5 m of dry soil under the floor and limits a hand-dug pit to 2.5 m below the pipe (our site limit). Delivery is charged separately; see delivery.
Four reasons we hear about, and what each one looks like
Clay soil
Clay takes water slowly, past 30 minutes per 25 mm. A pit can't fix that; the code moves to a long shallow trench, or the outlet goes to a drain. The soil test above tells you before you spend.
High water after the rains
The ground water has risen into the pit. Next time, check in October and leave a dry gap under the floor. For a built pit, keep bath water out of it in the rains and empty the septic tank on time.
Sludge and kitchen oil
A septic tank never emptied sends sludge out with the water, and oil from the sink coats the gitti. Empty the tank on time (septic tank care) and put an oil-catching chamber on the kitchen line.
Rain and silt pouring in
A roof pipe tied into the pit, or a cover at ground level, fills it with water and silt. Raise the cover, slope the soil away, and give the roof water its own line.
Old pit choked? Empty the septic tank first, then open the pit, take out the top layer of gitti and wash or change it. If the soil around is sealed, dig a second pit beside it and join the two with a 110 mm pipe near the top, so the first one overflows into the second.
What a soak pit is built with
Prices are from our latest bill and change often. Please confirm today's rate on WhatsApp or call before buying.
Bricks (eent)Awal, well-burnt, for the lining · by the thousand₹ 10,479per 1,000 Gitti (stone chips)Coarse, behind the lining and on the floor · per cft₹ 110per cft 110 mm SWR pipeSeptic tank outlet to the pit, and a bend · per lengthAsk today's rateper length UltraTech PPC cementMortar for the top courses, the cover slab · 50 kg₹ 330per bag Tata Tiscon 8 mm sariyaMesh for a cast cover slab · per kgAsk today's rateper kg Balu (sand)For the mortar and the cover concrete · per cft₹ 57per cftBrick bats (jhama), a precast cover with lid, or any pipe fitting not listed here: we can order it for you; ask on WhatsApp for the time it takes. Today's prices: balu, gitti, eent · cement.
Short answers
Can toilet water go straight into a soak pit?
No. Toilet water goes to the septic tank first, where the solids settle. Only the settled water from the tank's outlet goes to the soak pit. Raw toilet waste blocks the soil around the pit within months.
How far from the boring? (soak pit boring se kitni door)
IS 2470 (Part 2) asks for at least 18 m (about 60 ft) from any source of drinking water, and that includes a neighbour's boring or handpump. It also asks for at least 6 m (about 20 ft) from the nearest house. Some websites print 30 m or as little as 6 m from the boring; we follow the code's 18 m.
What size should a soak pit be?
The code's minimum is 90 cm across and 1 m deep below the inlet pipe. The real size depends on how much water goes in and how fast your soil takes it. A family of five sending only septic tank water into soil that tests at 10 minutes needs about 3 m² of wall: one 1.2 m pit about 1 m deep below the pipe. Add bath and kitchen water and it needs three times as much.
Does a soak pit work in Muzaffarpur?
On many plots, yes; on low plots near the rivers, often not. The code rules it out where ground water comes within 1.8 m of the surface, and CGWB found post-monsoon water levels from 0.67 to 5.21 m below ground across the district. Check your own site in September–October.
Is a soak pit the same as the twin-pit toilet?
No. A twin-pit toilet, the kind built under Swachh Bharat, takes the toilet waste itself into one pit at a time, with no septic tank. A soak pit only takes the settled water that leaves a septic tank. Don't connect a septic tank to a twin-pit, or a pan straight to a soak pit.
Should the pit be filled with gitti?
A pit lined with honeycomb brickwork can stay empty inside; the code puts at least 7.5 cm of coarse gitti behind the lining. An unlined pit must be filled with stone or brick bats so its sides don't fall in.
How long does a soak pit last?
As long as the soil around it stays open. A pit fed only by a septic tank that is emptied on time and kept free of rain and oil lasts many years. Sludge, oil and silt are what end it early.
Twenty years on sites around Muzaffarpur, where a soak pit dug in May can stand full of water by October. The sizes, distances and soil figures on this page were checked against IS 2470 (Part 2) on 14 Nov 2026. Water quantities per person and the brick and gitti counts are our working figures and are labelled so.
Where the numbers come from
- Bureau of Indian Standards, IS 2470 (Part 2):1985, septic tank effluent disposal: Table 1 (soak pit not where subsoil water is within 1.8 m; trench for 30–60 min), Table 2 and Fig. 1 (effluent rate per m² by percolation rate), clause 5.2 and Fig. 2 (90 cm minimum, 1 m below inlet, dry open joints, 7.5 cm coarse aggregate backing, lining in mortar above inlet, cover slab), clause 5.3 (distance from water source; not closer than 6 m to a building), Appendix A (percolation test, wettest season).
- InfraLens, summary of IS 2470 (Part 2): 18 m from a drinking-water well, 1.5 m clearance from the bottom of the absorption system to ground water.
- Central Ground Water Board, Ground Water Information Booklet, Muzaffarpur district: depth to water 2.09–7.63 m (pre-monsoon) and 0.67–5.21 m (post-monsoon), 2011.
- Other figures seen and not used: civiconcepts.com (30 m from water, 2 m above ground water), gharpedia.com (30 m from boring), comaron.com (6 m from borewell, 3 m from foundation).
Send us your plot sketch
Mark the boring, the house and the septic tank. We'll suggest where the pit can go and send the bricks, gitti and pipe list with today's price on WhatsApp.