Waterproof the roof while you cast it: WP+200 in every bag, a fall to the khurra, and Hi-Flex before the first rain

The short answer
  1. Dhalai with WP+200
  2. Tarai 14 days
  3. Dry, gola at parapet
  4. Hi-Flex × 2
  5. Screed with WP+200

Do it now, while the roof is being built. On dhalai day the concrete gets WP+200 and its top gets a fall towards the khurra. Once the slab has been cured and has dried, two coats of Hi-Flex go on, then a screed over them. All of it before the monsoon. Waiting for the first leak costs more and leaves you with a stained ceiling.

200 ml
WP+200 per 50 kg bagLitres = bags × 0.2. A 100-bag slab takes 20 L. (UltraTech)
1 in 100
Least fall to the khurra1 inch for every 8 ft of run. (Dr. Fixit)
162 kg
Hi-Flex for 1000 sq ftTwo coats plus 1 ft up the parapet. Buy seven 24 kg packs.
A new roof, waterproofed while building
Cross-section of a new roof slab between two parapets The roof slab is concrete with WP+200 in it, and its top falls towards a khurra pipe set through the right-hand parapet. At the foot of the left parapet a rounded mortar gola fills the corner. Two coats of Hi-Flex run over the slab and the gola and one foot up the parapet. A screed with WP+200 covers the coating and keeps the same fall. Each parapet has a sloped coping with a drip groove. The room below stays dry. ROOM BELOW dry ceiling, no stain 1 ft 1 2 3 4 5 6 7 1 2 3 4 5 6 7 Slab concrete Fall to the khurra Khurra pipe Gola at the parapet Hi-Flex, two coats Screed on top Sloped coping WP+200, 200 ml a bag · ≤ 25 L water at least 1 in 100 set before dhalai, at the low point rounded, about a palm wide crosswise, 1 ft up the parapet cement mortar with WP+200 with a drip groove
Not to scale: the fall, the coats and the screed are drawn many times thicker than they are. Dose, coats and screed: UltraTech Weather Pro brochure. Fall: Dr. Fixit. Gola, 1 ft upturn and coping: usual practice.
Now or later

Why the roof is waterproofed while it is built, not after it leaks

UltraTech's Weather Pro brochure is written around one idea: prevent while you build. Step 1 is waterproofing inside the concrete, everywhere. Step 2 is a second layer on the parts that take the most water, and the roof comes first. Each step does a different job.

1Concrete has pores

Even good concrete is full of fine channels that water creeps along. WP+200 goes in the mixing water and blocks them. UltraTech calls it Water Block Technology. It only works if it goes in on dhalai day. You can't add it to a finished slab.

2Concrete cracks

A slab shrinks as it dries and moves with the sun every day. Hairline cracks will come. Hi-Flex is a flexible two-part coating that UltraTech says stretches up to 100% and holds water pressure up to 7 bar, so it bridges cracks that rigid concrete can't.

3Standing water finds every crack

A roof where water stands after rain will leak sooner or later, whatever is in it. Water has to run off. That means a fall towards the khurra and the outlet pipes set in place before the concrete goes in. Both are decided on dhalai day.

What waiting costs: Dr. Fixit says retrofitting waterproofing can cost up to 20 times more than building it in. Later you pay for breaking the old screed or tiles, repairing the ceiling and painting the room below, on top of the same Hi-Flex. The two lists side by side.

On dhalai day

Three things that can only be done while the concrete is wet

Miss one, and the only fix later is breaking, cutting or chemical patching. Settle all three with your thekedar before the mixer arrives. The full day's list is in the dhalai checklist.

1WP+200 in every bag

In the slab concrete, and later in the screed
  • 200 ml for every 50 kg bag. Litres = bags × 0.2. Mark a bottle at 200 ml and keep one bottle per bag next to the mixer.
  • The cement, balu and gitti go in with half the water. WP+200 goes into the other half, and then that half goes into the mixer (UltraTech's method, drawn below).
  • No extra water because "the chemical is in". The limit stays 25 L per 50 kg bag (water-cement 0.5, IS 456).
  • Using Weather Plus cement? Use it or WP+200, not both. UltraTech gives no advice on mixing the two. Hi-Flex goes on top either way.
Dose by pack: WP+200 per bag. Product: UltraTech WP+200.

2A fall to the khurra

Marked on the shuttering, finished into the top
  • At least 1 in 100, which is 1 inch of fall for every 8 ft from the farthest corner to the khurra. Dr. Fixit's roof sheets give 1 in 80 to 1 in 100. Take 1 in 80 if your engineer allows it.
  • Mark the top level on the edge shuttering at the high side and at each khurra. Run a string between the marks and finish the concrete to it.
  • No dips. A spot where water stands is where the first crack opens.
  • If the slab came out flat, the fall can still be built later as a bed of WP+200 mortar before the Hi-Flex. It costs more cement and adds weight. The list below works it out.

3Khurras and sleeves set before the pour

So nobody cuts the new roof later
  • A khurra at each low point. For 1000 sq ft, two at least, so one blocked with leaves doesn't flood the roof. A usual figure is one for every 500 sq ft.
  • The mouth sits a little below the finished roof level, never above it.
  • Sleeves for the toilet stack, the tank line and cables go in now too. uPVC pipe pieces, tied to the shuttering.
  • Column bars sticking up for the next floor: cap them and plan a WP+200 mortar collar round each one later. Water follows the bar down.
How WP+200 goes into the mixer
Three steps for adding WP+200 to concrete Step 1: cement, balu and gitti go into the mixer with half the water and turn for two to three minutes. Step 2: WP+200 goes into a bucket holding the other half of the water, 200 ml for each 50 kg bag, and is stirred. Step 3: that bucket is poured into the mixer. The total water stays at 25 litres a bag or less. ½ ½ 200 ml per bag 1 2 3 Dry mix + half the water WP+200 into the other half Pour it into the mixer cement, balu, gitti turn for 2–3 minutes 200 ml for every 50 kg bag stir well then mix as usual total water still ≤ 25 L a bag
Steps 1–3: UltraTech Weather Pro brochure. The 25 L limit is water-cement 0.5 from IS 456. WP+200 doesn't change it.
Your roof from above: where the water goes
Top view of a 40 by 25 ft roof with two khurras A 40 ft by 25 ft roof inside its parapet. Khurras sit at the two front corners. A high line runs down the middle from back to front, and the back edge is high too. Arrows show each half of the roof falling towards its corner khurra. The farthest run is about 32 ft, so at 1 in 100 the highest point is about 4 inches above the khurra. highest point: about 4 in above the khurra high line khurra khurra 40 ft 25 ft Farthest run ≈ 32 ft → fall ≈ 4 in at 1 in 100 Four khurras, one per corner, cut it to about 3 in
The fall is worked out from the farthest point to its khurra. 1 in 100: Dr. Fixit roof FAQ. Khurra spacing and the high line: usual practice. Your engineer's drawing decides where they go.
From dhalai to the first rain

About four weeks, and it must be finished before the monsoon

Hi-Flex needs a cured, dry slab and a dry spell to go on. So count back from mid-June: a roof cast by the end of April is coated and screeded by 31 May.

From dhalai to the first rain, step by step Day 0: dhalai with WP+200 in every bag, top finished to the fall, khurras set. Days 1 to 14: curing with ponds kept full, at least 10 days and 14 in hot weather. From day 15: let the top dry in the sun. Then build the gola at every parapet foot with WP+200 mortar. Then Hi-Flex coat 1 over the roof, the gola and one foot up the parapet. At least 8 hours later, coat 2 crosswise. The next day, the screed with WP+200, kept damp for about a week. Then a pond test of 24 hours, all finished by 31 May. DAY 0DAY 1–14DAY 15+A DRY DAYAFTER dawndaily3–5 daysa daymorningnext a.m.day afterby 31 May Dhalai Tarai: ponds kept full Let the top dry Gola at every parapet foot Hi-Flex, coat 1 Hi-Flex, coat 2 Screed with WP+200 Pond test, then the rains WP+200 in every bag · ≤ 25 L water top finished to the fall · khurras set at least 10 days; 14 in heat (IS 456) WP+200 does not shorten it dry to touch and colour, sunny days mortar with WP+200, cured a few days parapet plaster done first roof, gola, 1 ft up the parapet mix and prepare as the pack says crosswise to the first coat cover the whole coat, keep the fall keep it damp about a week 1 inch of water for 24 h no damp patch on the ceiling below wait at least 8 hours
Step or gapFigure
WP+200 doseUltraTech Weather Pro brochure200 ml/bag
Water in slab concreteWater-cement 0.5, IS 456≤ 25 L/bag
Fall to the khurraDr. Fixit: at least 1:100; its roof sheets 1 in 80 to 1 in 100≥ 1 in 100
Curing the slabIS 456, blended cement: 10 days, 14 in hot dry weather. All our UltraTech bags are blended.10–14 days
Hi-Flex coat thicknessUltraTech0.6–0.7 mm
Coat 1 to coat 2UltraTech: second coat at right angles to the first≥ 8 h
Screed over the coatUltraTech "highly recommends" a screed or plaster over italways
Hi-Flex up the parapetUsual practice1 ft
The weather decides the dates. Hi-Flex, the gola and the screed all need a dry, clean slab to stick to. None of them goes on in rain or on a wet roof. Cast in the rains? Keep the khurras clear and the slab cured, and do the coating in October once the roof has dried. Read dhalai in the rains and, for the curing itself, tarai after dhalai.
Your roof's buy list

A 1000 sq ft roof, worked out. Change the sizes for yours.

Bags of cement become litres of WP+200. Square feet become kilos of Hi-Flex. Each figure uses the maker's numbers, and the method is printed under each line.

Roof: — sq ft · khurras: — · fall: —

Thickness comes from your engineer's drawing: how thick a lenter.

Your list

On dhalai day
UltraTech Premium, 50 kg—M20 at 1:1.5:3, dry volume = wet × 1.54 (usual practice). Balu and gitti:

Prices are from our latest bill and change often. Please confirm today's rate on WhatsApp or call before buying.

dhalai checklist.
Ask today's rate per bag
WP+200, in the slab—200 ml per 50 kg bag (UltraTech)
uPVC pipe for khurras—4-inch, one for about every 500 sq ft, at least two (usual practice)Ask today's rate per length
On the cured, dry roof
UltraTech Weather Pro Hi-Flex, 2 coats—1 kg covers 14–15 sq ft per coat at 0.6–0.7 mm (UltraTech). Two coats take double.—
Cement for gola and screed—Screed 1½ inch, 1:4 cement-sand, plus a palm-wide gola at every parapet foot (usual practice)Ask today's rate per bag
WP+200, in the gola and screed—200 ml per bag of cement in the mortar (UltraTech)
WP+200, the whole job——
Material totalAsk rate
Send this list on WhatsApp

Packs are picked for the higher figure. Prices fill in from today's rate. Bathrooms, tanks and walls: waterproofing calculator.

What it costs

Waterproofing now, or fixing a leaking roof later

The same 1000 sq ft roof both ways. The slab and a screed get built anyway. Doing it now adds only the WP+200 and the Hi-Flex. Today's prices: waterproofing rates · cement rates.

While building

What you buy

  • WP+200, about 25 L, in the slab and screed · Ask rate
  • Hi-Flex, seven 24 kg packs (about 162 kg needed) · Ask rate
  • Screed and gola, 28 bags and about 140 cft balu · Ask rate, but a roof screed gets laid anyway
  • Two khurras set before the pour · Ask rate
  • Labour: two days for the coats and the screed
Material total: Ask rate · ceiling and rooms untouched
After the first leak

What you pay for again, plus

  • Breaking and carrying off the old screed or roof tiles
  • Cutting cracks open and filling them with Seal & Dry SBR and WP+200 mortar
  • The same Hi-Flex, seven 24 kg packs · Ask rate
  • A new screed, 28 bags again · Ask rate
  • The ceiling and walls below: scraping, drying, waterproof putty, primer, paint
  • A monsoon of damp rooms, and sariya in the slab that has been wet
Material total: Ask rate · Dr. Fixit: up to 20 times the cost of doing it first

Already leaking? Start here: water dripping from the roof, then waterproofing an existing roof.

What goes wrong

Six ways a new roof still leaks

Each one is a step that was skipped or rushed. The red part of each drawing is the mistake.

40 L EXTRA WATER

"The chemical is in, add more water"

You see: damp patches under a roof that has WP+200

Extra water leaves the concrete full of pores, and WP+200 can't close them all. Keep to 25 L per 50 kg bag (IS 456). If the mix is too stiff, ask your engineer. Don't reach for the hose.

NO FALL · LEVEL

Roof cast dead flat

You see: puddles a day after rain, then a drip

Standing water soaks into every hairline crack, every day of the monsoon. Mark the fall on the shuttering before the pour, at least 1 in 100. If it is missed, build it in a sloping bed before the coating.

COATING STOPS HERE

Coating stops at the parapet foot

You see: a stain along the top of the wall, under the parapet

Most roof leaks start where the parapet meets the slab. Round the corner with a gola and carry Hi-Flex 1 ft up the wall. Details on the parapet page.

MOUTH ABOVE THE ROOF

Khurra set high, or cut in later

You see: a pond in the corner by the outlet

A mouth sitting above the roof keeps a pond in front of it. A hole broken through later cracks the slab around it. Set the pipe before dhalai, with its mouth a little below the finished roof.

NO SCREED ON TOP

Hi-Flex left bare

You see: worn patches by the tank and the stairs

Feet, the water tank, sariya being dragged for the next floor and the summer sun all wear a bare coat thin. UltraTech "highly recommends" a screed or plaster over it. Lay one with WP+200.

WET OR DUSTY SLAB

Coated too soon, or over dust

You see: blisters, then peeling coat

A coat can't stick to dust, and water trapped under it pushes it up. Finish the curing, let the roof dry, sweep and wash off the dust and loose mortar, and prepare the surface the way the Hi-Flex pack says.

Questions people ask us

Short answers

Should I waterproof during construction or fix it after?

During construction. UltraTech's Weather Pro brochure is built on prevention while building: WP+200 in the concrete and mortar, then a coating such as Hi-Flex on the roof. Dr. Fixit says retrofitting can cost up to 20 times more than building it in. After a leak you also pay to break the old screed and repair the ceiling.

How much WP+200 per bag of cement? (dhalai me waterproofing kitna)

200 ml for every 50 kg bag, as UltraTech's brochure says. Litres needed = bags × 0.2, so a 96-bag slab takes about 19 L: one 20 L pack. Mix the dry materials with half the water, add WP+200 to the other half, then add that. More in WP+200 per bag.

If WP+200 is in the slab, do I still need Hi-Flex?

Yes, on a slab that stays the roof. UltraTech's system has two steps: WP+200 inside the concrete for the whole house, and a coating such as Hi-Flex as double protection on roofs and terraces. Concrete gets fine cracks from shrinkage and heat; the flexible coat bridges them.

Can Weather Plus cement and WP+200 go in together?

Use one or the other in the slab. Weather Plus is already water-repellent, and UltraTech publishes no advice on adding WP+200 to it. Either way, Hi-Flex still goes on the finished roof. Choosing the bag: cement for chhat dhalai.

How many days after dhalai can Hi-Flex go on?

After the curing is over and the top has dried. Cure at least 10 days, 14 in hot dry weather (IS 456 for blended cement), let the roof dry in the sun, build the gola at the parapet, then lay two coats at least 8 hours apart. That is usually the fourth week after dhalai.

The next floor will come in a year or two. Waterproof now?

Yes. Until then this slab is your roof, through at least one monsoon. Coat it and screed it now. When the next floor comes, the coat simply stays under the new floor. Put a WP+200 mortar collar round each column bar sticking out, and carry the Hi-Flex up onto it, because water runs down the bars.

We will lay tiles on the roof. Is Hi-Flex still needed?

Yes. Tiles and their joints let water through, and the bed under them holds it. The Hi-Flex goes on the slab first, then the screed or tile bed with WP+200 over it.

Is Dr. Fixit LW+ the same as WP+200?

Both are liquids you add to the mixing water, and Dr. Fixit's published dose for LW+ is the same 200 ml per bag. We stock WP+200. If your engineer has written LW+, we order it for you.

Mr Mustafaa
Paint Engineer, Tashya Ventures

Paint and waterproofing at our Reva Road store, Muzaffarpur. Every number on this page was checked against the maker's own sheet on 12 Nov 2026. Where the makers disagree, the page says so and gives the safer figure.

Where the numbers come from

  1. UltraTech, Weather Pro preventive waterproofing guide (brochure): the two steps (integral waterproofing for the whole structure, double protection for roofs and other high-risk areas); WP+200 at 200 ml per 50 kg bag, dry mix with 50% of the water for 2–3 minutes, WP+200 into the other 50%, packs 200 ml to 100 L; Hi-Flex two coats of 0.6–0.7 mm at least 8 hours apart, the second at right angles, 1 kg mix covers 14–15 sq ft, elongation up to 100%, up to 7 bar, screed or plaster "highly recommended" on top, packs 12 and 24 kg.
  2. Bureau of Indian Standards, IS 456:2000 Plain and reinforced concrete: water-cement ratio 0.5 (25 L per 50 kg bag), clause 13.5.1 curing: at least 10 days for blended cement and in hot weather, extendable to 14.
  3. Dr. Fixit, Roof waterproofing FAQs: a slope of at least 1:100 in the mortar under the coating. Dr. Fixit Roofseal technical sheet: roof slope 1 in 80 or 1 in 100.
  4. Dr. Fixit, Essential roof waterproofing solutions for new home construction: retrofitting can cost up to 20 times more than building it in.
  5. Coverage per coat: UltraTech gives 14–15 sq ft per kg next to a 0.6–0.7 mm coat. A kilo of mix can't cover 14 sq ft with two coats that thick, so we count the figure per coat and double it for two.
  6. Gola size, Hi-Flex 1 ft up the parapet, screed 1½ inch at 1:4, one khurra per 500 sq ft: usual practice, not a maker's figure.

Send us your roof size and dhalai date

We'll send back the cement, WP+200 and Hi-Flex for your roof with today's price on WhatsApp. Send photos of the sariya on WhatsApp before dhalai, and we'll check them with you.