How it works
  1. You sendA photo of the naksha, or the rooms on each floor typed out, with your ACs, geysers and pump.
  2. Sashikesh countsEvery point, run and circuit, by the same rules as our coil counter and MCB chart.
  3. You get backWire coils by size and colour, conduit, boxes, MCBs, RCCB and the DB box, split by building stage, with today's price on each line.
₹ 0
For the listYou pay only for what you buy, at the day's price.
Same day
UsuallySent by 3 pm, Mon–Sat. Later: next working morning.
No visit
Photos insteadWe look at your slab and walls on WhatsApp with you.
One chat, start to finish
A WhatsApp chat with the store The customer sends a photo of a hand-drawn naksha with two rooms, kitchen and bath, and writes one AC, one geyser and a pump. Sashikesh asks the AC name-plate amps. The customer replies 9.8 A. The store replies with the wiring list: 1.5 and 2.5 square mm coils in red, black and green, 6 square mm main, 20 and 25 mm pipe, boxes, seven MCBs, a main, an RCCB and a 13-way DB, with prices. T Tashya Ventures Sashikesh · electrical Room 1Room 2KitchenBath G floor · AC, geyser, pump 10:42 ✓✓ Got it. What amps are on the AC's name plate? 10:55 9.8 A 11:02 ✓✓ Wiring list · 2 rooms, G floor 1.5 sq mm · R1 B1 G1 coilsAsk rate 2.5 sq mm · R1 B1 G1 coilsAsk rate 6 sq mm main · ~33 mAsk rate Pipe 30 × 20 mm, 28 × 25 mmAsk rate Boxes: 2 fan, 5 round, ~10Ask rate MCB ×7 + DP main + RCCBAsk rate DB box, 13 wayAsk rate Full list by stage below ↓ 1:40 pm
A sample chat. Quantities are the ones our coil counter gives for this house; prices come filled in with the day's rate.
Step 1 · what to send

Any one of these three is enough to start

The best is the naksha. If you don't have one yet, a typed room list works. If your electrician has already made a point list, send that and we count from his.

Best

A photo of the naksha

The map-pass drawing, the architect's plan or a hand sketch on paper. Each floor you will build, even if the top floor comes later.

Lay it flat in daylight. Whole sheet in the frame. Room names readable.
No naksha yet

A room list, typed

Floor by floor: rooms, kitchen, bathrooms. Then the heavy things. We assume the usual points per room and say so on the list.

G floor: 2 rooms, kitchen, 1 bath 1 AC, 1 geyser, pump 1st floor: later
Most exact

The electrician's point list

If he has marked lights, fans and sockets room by room, send a photo. The count is then his, and our job is the coils, pipe and board behind it.

Room 1: 2 light, 1 fan, 2 × 6 A, 1 × 16 A, AC Kitchen: 1 light, 3 × 16 A
What we mark on your naksha
A two-room naksha with electrical points marked Plan of two rooms, a kitchen and a bath. Each room has two lights, a fan, two 6 amp sockets and one 16 amp socket; room 1 also has an AC point. The kitchen has a light and three 16 amp sockets; the bath has a light and a geyser point. The meter is outside the front wall and the DB inside near the entry. Dashed lines show runs from the DB. ROOM 1 · 12×11ROOM 2 · 12×11KITCHENBATH LLLLLL FF 6A6A6A6A 16A16A16A16A16A AC GEY DB M Meter outside · main to DB inside L light F fan 6A / 16A sockets AC · GEY own line Dashed: runs from the DB, each one counted in metres.
Points per room are usual practice here (two lights, a fan, two 6 A sockets, one 16 A socket), the same as on our coil counter. Change them on the list if your rooms differ.

Add these lines and the list comes back right the first time

  • Floors: now and laterA floor you will build in five years still needs its pipe in today's slab.
  • Each AC's name-plate ampsUp to 12 A, or 12 to 16 A. It decides 2.5 or 4 sq mm and the MCB. Wire for an AC
  • Geysers and the water pumpEach gets its own line from the board.
  • Sanctioned load from the NBPDCL bill, in kWIt sets the main switch and the main wire. No bill yet? Say so. Meter and load
  • Inverter, now or laterIts circuits come back to the board separately, so we plan them before the pipe goes in.
  • Your stage todayBefore slab, before plaster, or wire time. We price the stage you are at first.
Step 2 · what comes back

A list you can hand to your electrician, in the order you buy it

This is the list for the house in the chat above: two rooms, kitchen and bath on the ground floor, one AC under 12 A, a geyser and a pump. Your list has your quantities and the day's price on every line.

Sample wiring material list A list in four stage groups. Before the slab: 30 lengths of 20 mm conduit, 28 lengths of 25 mm, 2 fan boxes with rod, 5 round boxes, earthing material for the pit. Before plaster: about 10 switch boxes and a 13-way DB box. After plaster: 1.5 square mm one red, one black, one green coil; 2.5 square mm one of each colour; about 33 metres of 6 square mm main. The board: two B10, four C16 and one B16 MCB, a double-pole main of 20 or 25 amps, and a 30 milliamp RCCB. After paint, switches and sockets only if asked. Every line shows a price. WIRING LIST 2 rooms · kitchen · bath · AC · geyser · pump · G floor Tashya Ventures 1 BEFORE THE SLAB Conduit 20 mm, 3 m30 Conduit 25 mm, 3 m28 Fan box with rod2 Round ceiling box5 Earthing for the pit1 set Ask rateAsk rateAsk rateAsk rateAsk rate half the pipe now, half for the walls · bends, caps extra 2 BEFORE PLASTER Metal switch boxes~10 DB box13 way Ask rateAsk rate box sizes from the module count on each board 3 AFTER PLASTER · WIRE AND BOARD 1.5 sq mm, 90 m coil 2.5 sq mm, 90 m coil 6 sq mm main, meter to DB~33 m MCB B10 (lights, 6 A)2 MCB C16 (kitchen, AC…)4 MCB B16 (geyser)1 DP main, 20 or 25 A1 RCCB 30 mA, DP1 1 1 1 1 1 1 Ask rateAsk rateAsk rateAsk rateAsk rateAsk rateAsk rateAsk rate red · black · green · main size from your sanctioned load 4 AFTER PAINT · IF YOU ASK Switches, sockets, plates, fansAsk rate TOTAL Ask rate today's price · delivery amount asked for your site
Quantities: our coil counter for this house, with 10% spare. MCB split and DB ways: our MCB page (one way per MCB, two spare, two each for the main and RCCB).

Every line follows a rule you can read

We don't guess per square foot. Each number on the list comes from one of our guides, so you, your electrician and we are all counting the same way.

What the list is not

  • Not a labour quote. Labour is between you and your electrician. House wiring should be done by an electrician licensed by the state: who should do the wiring.
  • Not fixed for ever. Add a room or move an AC and we redo it. Send the change in the same chat.
  • Not tied to one bill. Buy stage by stage. Send "stage 2 please" and we re-price that part at the day's rate.

Want a number before you send anything? Our coil counter and the wiring calculator give a first figure. Or take the whole list on one bill as the whole-house wiring kit.

Step 3 · how long it takes

Usually back the same working day

Sashikesh makes each list himself at the Reva Road store, between serving the counter. The store is open Monday to Saturday, 8 am to 6 pm.

When the list comes back A day from 8 am to 6 pm. A naksha sent by 3 pm gets its list the same evening. One sent after 3 pm, or on Sunday, gets it the next working morning by about 11 am. If something on the naksha is unclear, one question comes first. 8 am10122 pm46 pm 3 PM Sent now → list today → next morning Sent by 3 pm, Mon–Sat: list the same day After 3 pm or Sunday: next working day, by 11 am
Usual times, not a promise to the minute. A three-floor house or a shop with a house above can take a day more.
Clear naksha, all lines given
One reply

The list comes straight back with prices.

Something missing
One question first

Most often the AC plate amps or the sanctioned load. Answer it and the list follows.

Changes later
Same chat

New room, extra AC, next floor: send it and we redo the part that changed.

No site visits

Photos on WhatsApp in place of a visit

We don't offer free site visits. What a visit would check, three photos show: send them before each part gets buried, and we look at them with you.

PHOTO 1

The day before dhalai

Pipes, round boxes, fan boxes in the slab

One photo per room from a height. We check every fan has its box and the AC and future floor have pipe. Slab checks

PHOTO 2ROOM 1 · EAST WALL

The day before plaster

Every wall box and groove

Each wall, with the room name chalked on it. We count boxes against the list and spot the missing AC or geyser point. Plaster checks

PHOTO 3

Before the painter starts

The wired board, cover off

We read the MCB ratings against the wire behind them and check the earth bar. Putty-stage checks

Short form · no OTP

Three lines, and WhatsApp opens with your message ready

Nothing is saved on this site. The form only writes the message; you press send in WhatsApp and attach the naksha photo there.

Please write a 10-digit mobile number, or leave it empty.

On a computer without WhatsApp? Call 90310 74624, or bring the naksha to the counter.

After you press send

  1. Attach the photo in the same chat: the paperclip, then Camera or Gallery.
  2. We reply in shop hours, with one question if the naksha leaves one open.
  3. The list comes back by stage, with today's price on each line.
  4. Buy the stage you are at. Keep the chat; send "next stage" when you get there.

Collect at the store or ask for delivery: delivery and transport. Where we are: our store.

Questions people ask us

Short answers

Is the estimate really free? (wiring estimate free hai?)

Yes. The list costs nothing. We make it because we hope you will buy the material from us, and every line carries the day's price so you can compare.

Will someone come to my site to measure?

We don't offer site visits. Send photos on WhatsApp instead: the naksha for the list, then the slab the day before dhalai and the walls the day before plaster, and we will look at them with you.

How long does the list take?

Sent by 3 pm, Monday to Saturday, it usually comes back the same day. Sent later, or on Sunday, it comes the next working morning. If the naksha leaves a question open, we ask it first.

Can I just send the area in square feet?

Square feet alone don't decide the wire; rooms, points, ACs and floors do. Two houses of 1,000 sq ft can need very different coils. Send the room count per floor or the naksha. Why: coils for a 1,000 sq ft house.

My naksha is hand-drawn. Is that enough?

Yes, if the rooms are named and each floor is shown. Sizes help with the run lengths but we can work without them; the list then says it uses usual room sizes.

Does the list include labour or the electrician?

No. It is a material list. Labour is between you and your electrician. The CEA safety regulations ask for house wiring to be done by a state-licensed electrical contractor, and NBPDCL checks the work, or a licensed contractor's test results, before it connects you.

My electrician says the list is too much, or too little. Who is right?

Send us his point list. If his points differ from ours, we count from his. If the points match and the metres don't, we show the run lengths we used so you can see where the difference is.

I am building one floor now. Do I need the upper floor on the list?

Only its pipe, in today's slab, and empty ways on the board. Its wire comes when you build. Tell us the floors you plan and we split the list.

Sashikesh Kumar
Diploma in Electrical, Tashya Ventures

Looks after wires, switchgear, inverters and pumps at our Reva Road store, Muzaffarpur, and makes the wiring lists sent from this page. Each list follows the same counts as our coil counter and the MCB and wire figures from V-Guard's own sheets.

Where the rules come from

  1. V-Guard, Classo+ house wire product page: current in a wall pipe 1.5 sq mm 13 A, 2.5 sq mm 18 A, 4 sq mm 24 A; 90 m coils.
  2. V-Guard, Elegna MCB technical specification: SP and DP, 6 to 63 A, B and C curve.
  3. Central Electricity Authority, (Measures relating to Safety and Electric Supply) Regulations, 2023: reg. 31 (licensed electrical contractor), 33 (testing before supply), 44 (30 mA residual current device in homes).
  4. IS 732: earth wire the same size as the phase (standard figure).
  5. Points per room, metres per run, 10% spare, pipe sizes, DB ways and turnaround times: usual practice at our counter, as set out on wire coils for a house and which MCB for which load.

Send your naksha now

A photo of the plan or your room list. Sashikesh sends back every coil, pipe, box and MCB, with today's price, on WhatsApp.

TASHYABUILDING SOLUTIONS · MUZAFFARPUR
WhatsApp 90310 74624tashyaventures.com