Wiring checklist for a new house: what to check before the slab, before plaster, before putty, and at the end

The short answer
  1. 1Before the slab is cast: pipes, ceiling boxes and fan boxes. No wire yet.
  2. 2Before plaster: every wall box and pipe in place, level and flush.
  3. 3Before putty: wire pulled, board wired, earth joined, insulation tested.
  4. 4After paint: switches, sockets and fans fitted, then every test before the last payment.

Each stage buries the one before it: concrete, then plaster, then putty and paint. A miss found at the next stage means breaking something. So the check happens on the day before, not after.

20 / 25
mm conduit20 mm for light and fan runs, 25 mm for sockets, AC and the main.
3 wires
In every circuitPhase, neutral and earth, with the earth the same size as the phase.
30 mA
RCCB, requiredCEA safety regulations 2023 require one in every home.
One wall, four checks
The same wall and ceiling at the four stages of wiring Stage 1: conduit and a fan box lying on the slab shuttering, open ends capped. Stage 2: brick wall with a pipe in a cut groove and a switch box stuffed with paper. Stage 3: plastered wall with red, black and green wires coming out of the box and the fan box. Stage 4: painted wall with a switch plate and the fan hung. fan box + rodpipe on the plateend capped no wire in the concrete,only pipes and boxes box level,paper inside groove, pipe, box phase, neutraland earth plaster done, putty not yet fitted last,then tested paint dry 1 2 3 4 BEFORE SLABBEFORE PLASTERBEFORE PUTTYFINAL
Not to scale. Red is phase, black is neutral, green is earth: wire colours.
1
Check 1 of 4

Before the slab is cast

Do it the day before dhalai, with the shuttering and steel done. What closes it: concrete.
0 of 9
The one mistake at this stage

No fan box, or no pipe for the AC, "we'll decide later". After dhalai the only ways are to cut the slab, which weakens it, or run an ugly pipe on the ceiling. A fan hung on a hook knocked into old concrete is how fans fall.

The full list for slab day, with counts: conduit before slab casting · the rest of the slab (steel, cover, shuttering): chhat dhalai checklist

One bedroom slab, from above
Conduit and boxes on a bedroom slab before casting Top view of shuttering with steel. A fan box with rod at the centre, two circular light boxes, 20 mm pipes from each to a 25 mm drop at the wall where the switch board will be, a spare pipe toward the AC wall, and red caps on every open end. fan box + rod,rod tied to steel light box light box 25 mm drop down tothe switch board spare pipeto AC wall ■ cap every open end— 20 mm runs ┅ spare
Usual practice drawn for one bedroom: 2 lights and 1 fan. Pipes run toward the wall where the switch board will be, never across the room twice.
2
Check 2 of 4

Before plaster

Do it the day before the plaster mason starts. What closes it: plaster.
0 of 9
The one mistake at this stage

Boxes fixed before the guide strips. The box ends up deep inside the plaster or sticking out, and later the switch plate rocks, or the screws don't reach. Re-setting a box after plaster means cutting the new wall around it.

A printable one-page sheet for this day: electrical check before plaster

Usual heights, and where the box sits
Usual point heights on a bedroom wall, and a box set flush with the plaster Wall elevation with a door. Switch board about 4 feet from the finished floor beside the door, plain sockets about 1 foot, AC point about 7 feet. Heights are measured from the finished floor, which sits a few inches above the brick level. Inset: a box whose face meets the plaster line is right; a box sunk deep is wrong. door 4 ft1 ft7 ft switch boardsocketAC point ↑ finished floor (tiles) · measure from here↓ brick level, a few inches lower SIDE VIEW ✓ ✗ plasterfacetoo deep
Usual practice in houses here, not a code figure. Kitchen sockets go about 1 ft above the counter top; the geyser point high on the wall, out of splash. Agree any change with your electrician before the grooves are cut.
3
Check 3 of 4

Before putty

Wire is pulled after plaster, before the painter starts. What closes it: putty and paint over the boxes.
0 of 9
The one mistake at this stage

Pulling two wires to save a coil. The house works fine, and the socket earth leads nowhere. The first time a geyser body goes live, nothing trips, and the person touching it is the path. Pulled now, the earth wire costs one coil; pulled later, it means emptying every pipe.

How many coils of each size: wire coils for a house · when the painter can start after this: putty, primer, paint

The board, in the order power flows
Distribution board order and the earth path From the meter: a double-pole main, then a 30 mA RCCB, then one MCB per circuit: lights B10, sockets B10, kitchen C16, geyser 16 A, AC C16. A neutral bar and an earth bar sit below; the earth bar is wired to the earth pit outside. DP 30mA B10B10C1616AC16 mainRCCBlightssocketskitchengeyserAC neutral bar earth bar to the earth pit outside from the meter
A sample one-floor board. Your MCBs follow your wire, one per circuit: which MCB for which load. Neutrals go to the neutral bar and earths to the earth bar, never through an MCB.
4
Check 4 of 4

Final: after paint, before the last payment

Fit after the last coat of paint is dry, then test. What closes it: the electrician's last payment.
0 of 10
The one mistake at this stage

Paying the last instalment before the tests. Once the electrician is paid and gone, a socket with no earth or an RCCB that never trips stays that way until the day it matters. Hold the last payment until every line above is ticked.

The final test in more detail: final electrical test · ten mistakes we see: common wiring mistakes

What a finished board should show
Finished DB with circuit list and test record inside the door An open distribution board. Inside the door, a written list numbers each MCB with its circuit, plus the earth reading, insulation test and date. An arrow points at the RCCB test button with the note: press it, it must drop at once. CIRCUITS 1 Main DP 25 A2 RCCB 30 mA3 Lights B104 Sockets B105 Kitchen C166 Geyser 16 A7 AC C16 TESTEDEarth: ___ by ____Insulation: ____ date __ T Press T: the RCCBmust drop at once Written by the electrician, kept in the door.
The list is for you and every electrician after this one. Ratings shown are a sample; yours come from your wire.

Send us what's still open

We'll look at the unticked items with you, and send the material for the next stage with today's price. Photos of each wall help.

Send to Sashikesh
0/9Before slab
0/9Before plaster
0/9Before putty
0/10Final

Your ticks stay on this phone only. Nothing is sent until you press the button.

The material list, by stage

What to buy, and when to buy it

Buy each stage's material a few days before that stage, not all on day one. Then wire isn't lying on site through the plaster, and switches don't sit in a room while it's painted. Quantities: wire coils for a house or the wiring calculator.

BeforeBuyFrom us
1 · Slab20 and 25 mm conduit, bends, couplers, circular boxes, fan boxes with rod, end caps, earthing materialEarth rod or plate and earth wire for the pitConduit · circular boxes · fan box with rod
2 · PlasterMore conduit for the walls, metal boxes by module size, DB boxOne box per board, sized with one spare moduleMetal boxes · bends, elbows, tees
3 · PuttyWire coils by size, MCBs, DP main, 30 mA RCCB, PVC tapePhase, neutral and earth of each sizeV-Guard Classo+ · UltraBolt · Elegna MCB · PVC tape
4 · FinalSwitches, sockets, plates, regulators, indicator, fans, lightsCount modules per board firstTorio switches · sockets · plates · Haize VX fan

Want it all on one bill? Whole-house wiring kit. Send us your naksha and we'll make the list: wiring estimate service.

On our shelf for this job

Everything the four stages use

Anything not shown, any size, model or accessory: we can order it for you; ask on WhatsApp for the time it takes. Today's prices: electrical rates · wire price list.

Questions people ask us

Short answers

When should wiring be done in a new house? (wiring kab karwayein)

In four steps that follow the building. Pipes and boxes go in before the slab is cast and before the walls are plastered. Wire is pulled after plaster and before putty. Switches, sockets and fans go on after the last coat of paint, followed by the tests.

Is wire put in the slab before casting?

No. Only the conduit pipes, circular boxes and fan boxes go into the slab. Wire is pulled through the pipes much later, after plaster, so the pipes must be continuous, capped at the ends and fitted with a pull wire.

Can wiring be done after plaster?

Wire pulling is done after plaster. Pipes and boxes are not: if they were missed, the new plaster has to be cut and patched, or the wire runs on the surface in a casing. That is why the check before plaster matters most for the walls. Concealed or surface wiring

Is an RCCB compulsory in a house?

Yes. The Central Electricity Authority's safety regulations of 2023 (regulation 44) say an installation must be controlled by a residual current device, and for a home its operating current must not exceed 30 mA. Fit a 30 mA double-pole RCCB after the main switch. MCB vs RCCB

Do all sockets need earthing?

Yes. For new or renovated installations the CEA regulations (43) say all plug sockets must be three-pin, with the third pin permanently earthed. So a green earth wire, the same size as the phase wire, runs with every circuit.

When should switches and plates be fitted?

After the last coat of paint has dried. Fitted earlier, they get paint on them, the painter cuts around them, and the plates are taken off and put back with dust in the boxes.

Who should do the wiring?

The CEA regulations (31) say house wiring is to be done by an electrical contractor licensed by the state government. It matters at the end: before NBPDCL connects the house, it either tests the wiring itself or accepts test results signed by a licensed contractor (regulation 33).

Will you come to the site to check?

We don't promise site visits. Send photos on WhatsApp before dhalai and before plaster, one per room or wall, and we will look at them with you.

Sashikesh Kumar
Diploma in Electrical, Tashya Ventures

Looks after wires, switchgear, inverters and pumps at our Reva Road store, Muzaffarpur. The rules on this page were checked on 13 Nov 2026 against the Central Electricity Authority's 2023 safety regulations and V-Guard's own sheets. Where a figure is our usual practice rather than a rule, the page says so.

Where the rules come from

  1. Central Electricity Authority, (Measures relating to Safety and Electric Supply) Regulations, 2023, Gazette of India, 8 June 2023: reg. 31 (work by a state-licensed electrical contractor), 33 (installation tested by the supplier, or results signed by a licensed contractor accepted, before supply), 35 (insulation resistance checked before connection), 43(viii) (new or renovated installations: all plug sockets three-pin, third pin earthed), 44 (residual current device; in homes, not more than 30 mA).
  2. V-Guard, Classo+ house wire product page: current in conduit 1.5 sq mm 13 A, 2.5 sq mm 18 A, 4 sq mm 24 A, the figures behind the MCB rule.
  3. V-Guard, Elegna MCB technical specification: SP and DP, 6 to 63 A, B and C curve.
  4. IS 732 (code of practice for electrical wiring installations): earth wire the same size as the phase wire; insulation tested at 500 V between each conductor and earth.
  5. Pipe sizes, box heights, spare wire in boxes and the order of work: usual practice of electricians in Muzaffarpur, labelled as such on the page.

Send us your naksha

Sashikesh will mark the points, the pipes and the board, and send the list for your next stage with today's price on WhatsApp.

TASHYABUILDING SOLUTIONS · MUZAFFARPUR
WhatsApp 90310 74624tashyaventures.com