Nine of the ten cost nothing to avoid if you catch them before plaster. The fan box is the exception: once the slab is cast, it is gone. After the house is painted, every one of them means breaking something.
9 of 10
Free before plasterOnly the fan box has to be right before the slab is cast.
13 A
Limit of 1.5 sq mmIn a pipe, per V-Guard. A 3 kW geyser draws about 13 A.
30 mA
RCCB, requiredCEA safety regulations 2023 want one in every home.
Where the ten hide in one house
Not to scale. Each number is one mistake below; tap a number in the list to jump to it.
Start here
Where is your house today?
Pick the stage. Each mistake below then shows what it would cost you to fix it now, and the counts show how many are still free.
0Free now
0A few parts
0Break and redo
0Workaround only
The ten, worst first
What goes wrong, why it hurts, and what to do instead
Each one says what it does to you, what has to be broken to fix it later, and the right way with the rule behind it. The full steps live on the page linked at the end of each fix, so this page stays short.
1
Two wires pulled to save a coil, no earth
Why it hurts
Everything works, so nobody notices. The day a geyser element or a washing machine body leaks current, there is no path for it but the person touching it. A three-pin socket with no earth wire behind it is only a look.
Fixing it later
Every pipe has to be emptied and all three wires pulled again, if the pipe has room. If it doesn't, a separate earth wire runs on the surface in casing to each heavy point.
Do this instead
A green earth wire, the same size as the phase, in every circuit (IS 732), ending on the earth bar in the board, never on the neutral. The CEA safety regulations 2023 (reg. 43) want every socket in a new house three-pin with the third pin earthed. Make the earth pit while the plinth is open. Earthing basics
2
1.5 sq mm on the AC and geyser, because the lights use it
Why it hurts
1.5 sq mm carries 13 A in a pipe (V-Guard). A 3 kW geyser draws about 13 A for as long as it heats, and an AC runs for hours in a Muzaffarpur summer. The wire sits at its limit, warms the pipe and the socket, and the switch plate browns.
Fixing it later
If the pipe is 25 mm and not packed, the thin wire can be pulled out and the right size pulled in. In a full 20 mm pipe, the run has to be cut out and redone.
Do this instead
Read the amps on the name plate. AC up to 12 A (most 1 and 1.5 ton splits): 2.5 sq mm with a 16 A C-curve MCB. 12–16 A: 4 sq mm with a 20 A C-curve. Geyser 2 or 3 kW: 2.5 sq mm with a 16 A MCB, its own line. Never a 20 A MCB on 2.5 sq mm. Lay 25 mm pipe for these lines before plaster. Wire for an AC · wire amps chart
3
One MCB, or a kit-kat fuse, for the whole house, and no RCCB
Why it hurts
One big MCB is sized for the whole house, so it never trips for a single thin wire that is overheating. A fault anywhere blacks out everything, and nothing in the board protects a person: an MCB only protects the wire.
Fixing it later
Mostly parts: a proper DB with a main, an RCCB and one MCB per circuit. If the old box in the wall is too small, it has to be cut out for a bigger one, and circuits that were joined together have to be separated at the board.
Do this instead
A double-pole main, then a 30 mA RCCB (CEA reg. 44: not more than 30 mA in a home), then one MCB per circuit. CPWD keeps a light circuit to 800 W or 10 points, and a house power circuit to two 16 A sockets. Leave two or three spare ways. Which MCB for which load · MCB vs RCCB
4
Aluminium or a cheap unbranded coil to save money
Why it hurts
Aluminium and copper-clad aluminium carry less current for the same size and work loose at the screw terminals. Unbranded coils are often short in length, thin in copper, or both. It works on the day it is fitted, then runs hot at full load.
Fixing it later
Every wire in the house has to come out. That means opening every board and every point, after the paint.
Do this instead
Copper only: CPWD's specification allows nothing else for circuit and point wiring. Buy coils with the maker's name, size and IS 694 printed along them, on a GST bill. Cut the end and look: copper colour all through the strands. Real or fake wire · UltraBolt (Ultravolt) explained
5
Wires joined with tape inside the pipe or the wall
Why it hurts
A coil runs out mid-run, or two short ends are left over, and they get twisted, taped and pushed into the pipe. The joint is where the heat builds. When it fails, nobody can find it, and nobody can reach it without breaking the wall.
Fixing it later
The fault has to be traced room by room, the run pulled out, and new wire pulled in one length. If the joint has melted into the pipe, the wall is cut.
Do this instead
One piece of wire from box to box. CPWD allows joints only in a switch box or at the point, and only with a proper connector. Plan coil lengths so leftover pieces go to short runs. Wire coils for a house
6
The geyser switch, or a socket, at hand height inside the bathroom
Why it hurts
Wet hands, wet floor, bare feet, and a switch beside the shower. Splash gets into the switch and the box. The bathroom is the one room where a small leak of current can kill.
Fixing it later
After plaster the box has to be cut out and the wall patched. After tiles, tiles break too. The cheaper workaround is to leave the old box blanked and run the control from outside.
Do this instead
CPWD: no socket in a bathroom for a plug-in appliance; a switch or MCB for a fixed one like the geyser goes more than 2 m up and at least 1 m from the shower. Simplest is the usual practice here: the geyser switch, with its red indicator, outside the bathroom door at switch board height. CPWD recommends a double-pole switch or MCB for a geyser. Geyser line and wiring
7
No fan box in the slab, "we'll decide later"
Why it hurts
A ceiling fan is a spinning weight over a bed. The only thing meant to hold it is a rod cast into the slab and tied to its steel. Missed, the fan ends up on a hook knocked into old concrete, and that is how fans fall.
Fixing it later
There is no proper fix once the slab is cast. Cutting the slab weakens it. The workaround is a fan clamp held by anchor fasteners in drilled holes, fitted by someone who knows the slab, with the wire run on the surface in casing.
Do this instead
A fan box with rod at every fan point, the centre checked against the room. CPWD: a 12 mm rod bent into a U, legs turned out at least 19 cm each side and tied to the top steel; in a low room, the recessed clamp inside a metal box. CPWD hangs fans 2.75 m above the floor. Fan box before casting
8
One or two sockets in the kitchen
Why it hurts
A kitchen now has a fridge, RO, mixer, chimney, microwave or induction, and a phone charging on the shelf. With two sockets, a multi-plug lies on the wet counter and the induction and microwave share one thin socket.
Fixing it later
New boxes mean cutting plaster and usually tiles, plus new pipe to the board. The workaround, a surface board, sits right where water splashes.
Do this instead
Count the appliances and add two. CPWD puts kitchen sockets 23 cm above the counter, away from the stove and the sink, and limits a house power circuit to two 16 A sockets, so the kitchen gets two power circuits (usual practice). Chimney and RO get high points, the fridge its own. Points per room
9
No separate inverter line, so everything or nothing runs on backup
Why it hurts
If the inverter feeds the whole house, the first time someone switches on the geyser or the iron during a cut, the inverter trips or the battery drains in minutes. If it feeds nothing but one socket, the fans go off in the heat.
Fixing it later
Before putty it is only wire: light and fan circuits are pulled back to the board separately, if each room's pipe goes there. After paint, new wire has to be pulled to every room you want on backup.
Do this instead
Decide before plaster which lights, fans and sockets go on the inverter. Run them as their own circuits to a small inverter board; AC, geyser, pump and iron stay on the mains only. Inverter wiring points · inverter size
10
Switch boxes set crooked, or deep inside the plaster
Why it hurts
The box went in before the mason's guide strips, so nobody knew where the plaster face would be. The plate ends up slanting, rocking, or with screws too short to reach. It is the mistake everyone sees, every day, in every room.
Fixing it later
A deep box can sometimes take longer screws and a spacer. A crooked one has to be cut out and set again, then the plaster and paint patched around it.
Do this instead
Fix boxes after the guide strips are up, face on the finished plaster line, level by spirit level, heights measured from the finished floor. Check every wall the day before plaster. Electrical check before plaster
One look
What each mistake costs to fix, by the stage you catch it
Read across a row: the further right, the more it costs. The column for the stage you picked above is outlined.
Free now: decide it, buy the right thingA few parts: a part or two, no breakingBreak and redo: cut plaster or tiles, or pull out wireWorkaround only: the proper fix is gone
Our judgement of the work each fix needs, not a price list. Rupees depend on how much of the house is affected; for your own case send us photos. For what to check on each building day, use the new house wiring checklist.
Send us the ones still open
Tick the ones you have checked on your site. The button sends your stage and the rest to Sashikesh on WhatsApp, and he tells you what to fix first and what it needs.
Anything not shown, any size, model or accessory, including wire connectors: we can order it for you; ask on WhatsApp for the time it takes. Today's prices: electrical rates · wire price list. Want it all on one bill? Whole-house wiring kit.
Questions people ask us
Short answers
What is the most common wiring mistake in a new house? (wiring ki sabse badi galti)
Leaving out the earth wire, or pulling it only to a few sockets. The house works perfectly without it, which is why it gets skipped. Every circuit needs phase, neutral and a green earth of the same size, and every socket in a new house must be three-pin and earthed (CEA safety regulations 2023, reg. 43). Earthing basics
Can I use 1.5 sq mm wire for the geyser?
No. A 3 kW geyser draws about 13 A, which is all 1.5 sq mm carries in a pipe (V-Guard). Use 2.5 sq mm with a 16 A MCB on a line of its own. Which MCB for which load
Should the geyser switch be inside or outside the bathroom?
Outside is simplest and is the usual practice here: by the door, with an indicator. CPWD allows a switch inside only for a fixed appliance, more than 2 m up and at least 1 m from the shower, and no socket for plug-in appliances at all.
Is aluminium wire allowed for house wiring?
CPWD's specification for buildings uses copper only for circuit and point wiring, and that is what we sell. Aluminium and copper-clad aluminium run hotter for the same size and loosen at terminals. How to spot it
CPWD says 4 sq mm for power wiring. Why do you say 2.5 sq mm for a 16 A socket?
CPWD's government-building specification sets 4 sq mm as its minimum for power wiring. Houses usually follow the wire maker's rating instead: V-Guard rates 2.5 sq mm at 18 A in a pipe, so it takes a 16 A MCB safely. Both are safe; 4 sq mm is the extra margin if you want it.
What can I do if the fan box was missed in the slab?
There is no proper fix after casting. Ask someone who knows the slab to fit a fan clamp with anchor fasteners, avoid cutting the slab, and run the wire on the surface in casing. For the floors still to be cast, put a fan box with rod at every fan. Fan box before casting
Will you come and check my wiring?
We don't promise site visits. Send photos on WhatsApp before dhalai, before plaster and of your board, and we will look at them with you.
Sashikesh Kumar
Diploma in Electrical, Tashya Ventures
Looks after wires, switchgear, inverters and pumps at our Reva Road store, Muzaffarpur. The rules on this page were checked on 14 Nov 2026 against CPWD's General Specifications for Electrical Works and the CEA's 2023 safety regulations. Where a figure is our usual practice rather than a rule, the page says so.
Where the rules come from
CPWD, General Specifications for Electrical Works, Part I (Internal), 2013: cl. 3.8 (no joints in through-runs; joints only in a switch box or at the point, with a connector), 3.10 (light circuit up to 800 W or 10 points; a house power circuit up to two 16 A sockets), 3.11(vi) (sockets 23 cm above the kitchen counter, away from stove and sink; no socket in a bathroom for portable appliances; switch or MCB for fixed appliances above 2 m and at least 1 m from the shower), 3.12 (copper conductor only; minimum 1.5 sq mm light and 4 sq mm power wiring), 3.14 (double-pole MCB recommended for geysers), 3.16 (fan rod: 12 mm U-rod, legs bent 19 cm each side, tied to top steel; recessed clamp in a metal box; fans 2.75 m above the floor).
V-Guard, Classo+ house wire: current in conduit 1.5 sq mm 13 A, 2.5 sq mm 18 A, 4 sq mm 24 A.
IS 732 (code of practice for electrical wiring installations): earth wire the same size as the phase wire.
Geyser current: Havells lists 13.04 A for a 3 kW geyser, as on our geyser line page.
Which mistakes we see, their order, the fix-cost grid, the kitchen point count and the geyser switch outside the door: usual practice of electricians in Muzaffarpur, labelled as such.