"1000 sq ft" of what?
The rule works on built-up area of all floors. Plot area and carpet area give the wrong count. Ask which one the thekedar means.
The slab, plaster and floor are inside these totals, not on top. For two floors, count the built-up area of both. Use these figures to set your budget and order stage by stage. They are not a bill of quantities.
Ask this before any number. Then check what "1000 sq ft" means on your drawing.
350–420 bags. The usual Bihar house: 9-inch walls, an RCC slab, and a concrete band over the doors and windows. Most cement goes into the slab, the brick mortar and the plaster. Our worked house comes to about 365.
400–500 bags, or 0.4 to 0.5 bag per sq ft. Column footings, columns, and beams at plinth and roof are extra concrete, and the walls are still there. The same house built as a frame comes to about 450.
The bags-per-sq-ft rule works on built-up area: the covered area wall to wall, on every floor. Not the plot, not the carpet area. A ground and first floor of 1000 sq ft each is 2000 sq ft for this rule.
A plain Bihar house, worked out part by part, so you can see what each stage takes and when to order it. Your drawing will differ. The method stays the same.
| Stage and what goes in it | Bags |
|---|---|
| 1Foundation and plinthPCC bed 6″, 1:4:8: 27 · brick footing and plinth wall, 1:6: 43 · plinth band 6″, M20: 16Order just before the digging ends. | ≈ 85 |
| 2Walls up to the roof9″ brickwork, 1:6: 41 · 4.5″ partitions, 1:4: 5 · lintel band, M20: 16 · chhajjas: 7In lots, as the walls rise. | ≈ 70 |
| 3RoofSlab 5″, M20: 96 · stair to the roof: 10 · parapet 3 ft, 1:4: 7All of it, two days before the dhalai. A slab is poured in one go. | ≈ 110 |
| 4PlasterInside 2,740 sq ft, 12 mm, 1:6: 17 · outside 1,945 sq ft, 18 mm, 1:4: 25 · parapet: 3 · ceiling 900 sq ft, 8 mm, 1:3: 6Room by room. Keep 10–15 extra; the reason is in the next section. | ≈ 50 |
| 5FloorPCC 3″, 1:4:8: 22 · tile bed 20 mm, 1:4: 13 · cement slurry under tiles: 6 · plinth protection outside, 1:3:6: 10Before the tiling starts. | ≈ 50 |
| Whole houseAdd about 5% for wastage on a tidy site: about 385 bags to plan for. | ≈ 365 |
Thekedars, cement companies and our calculator all work this way. Once you know the steps, you can check any figure you are given. Ask for the mix and thickness behind it.
| Bags of cement (50 kg) for each | Bags |
|---|---|
| m³ of RCC, M20 (1:1.5:3)UltraTech: about 403 kg. Slabs, beams, columns, footings. | 8.1 |
| m³ of RCC, M25UltraTech: about 443 kg. UltraTech recommends it for slabs. | 8.9 |
| m³ of PCC, 1:3:6 / 1:4:8Plinth protection / foundation bed and floor base | 4.4 / 3.4 |
| m³ of brickwork, 1:6 / 1:4About 0.31 m³ of dry mortar in each m³ of brickwork | 1.3 / 1.8 |
| 100 sq ft of plaster, inside12 mm, 1:6, as UltraTech gives for inside walls | 0.6 |
| 100 sq ft of plaster, outside18 mm, 1:4 (UltraTech: 15–20 mm, 1:4) | 1.3 |
| 100 sq ft of ceiling plaster8 mm, 1:3 (UltraTech: 6–10 mm, 1:3) | 0.7 |
Dry-volume factor 1.54 for concrete (UltraTech), about 1.33 for mortar (standard figure).
| Roof slab over 1000 sq ft | M20 | M25 |
|---|---|---|
| 4 inch | 77 | 84 |
| 5 inch | 96 | 105 |
| 6 inch | 115 | 125 |
The full slab working, with balu and gitti, is in how much cement for a chhat dhalai. For any part of your own drawing, use the cement, sand and aggregate calculator.
Usually nobody cheated. Each of these moves the count, and the last two are where bags go missing.
The rule works on built-up area of all floors. Plot area and carpet area give the wrong count. Ask which one the thekedar means.
Over the same length, a 9-inch wall holds about twice the mortar of a 4.5-inch one. Inside walls that carry the roof are 9-inch too.
The slab is the biggest single pour. One inch more over 1000 sq ft is about 19 bags at M20. Read the thickness off the drawing.
Some pages work a 5-inch slab out at 75 bags using 1:2:4. That is about M15, and IS 456 allows nothing below M20 in reinforced concrete. Don't plan a slab on a mix you shouldn't pour.
This is why UltraTech's own figure (1 to 1.5 bags per 100 sq ft) is above the arithmetic. Straight brickwork with even joints saves plaster cement.
Bags left on damp ground, or mortar mixed and left to set, go to waste. Stack on planks, away from the wall, covered, oldest bags first. Buy for the stage in front of you. Delivery check.
Put in your built-up area and floors. You get the whole-house range, the slab worked out exactly, and what is left for the other stages. For each part's own numbers, use the full calculator.
Planning figures, not a bill of quantities. Each part of your drawing: cement, sand and aggregate calculator. Cutting and delivery are charged separately; ask for the amount for your site.
The rest of the material for the same house: sariya kitna lagega · bricks for 1000 sq ft · balu and gitti for 1000 sq ft · the whole budget: cost of a 1000 sq ft house.
Prices are from our latest bill and change often. Please confirm today's rate on WhatsApp or call before buying.
UltraTech PPC, plain bagBrickwork, plaster, PCC, floor · stages 1, 2, 4, 5₹ 330per bag UltraTech SuperSlab, beams, columns, bands · stage 3₹ 435per bag UltraTech PremiumSlab, beams, columns · stage 3₹ 471per bag UltraTech Weather PlusRoof slab open to rain, damp plinth₹ 440per bagWhich slab cement and why: cement for chhat dhalai. Today's price for every bag: cement rates · sariya rates · balu, gitti, eent rates. Anything not on the shelf, we can order for you; ask on WhatsApp for the time it takes. Delivery is charged separately.
For one storey with brick walls and an RCC roof, 350 to 420 bags of 50 kg. For an RCC frame with columns and beams, 400 to 500 bags. Our worked Bihar house comes to about 365 bags, or about 385 with 5% wastage. These are planning figures, not a bill of quantities.
At M20, about 77 bags for a 4-inch slab, 96 for 5-inch and 115 for 6-inch. At M25, which UltraTech recommends for slabs, 84, 105 and 125. Beams and the stair are extra. Full working: chhat dhalai cement.
About 6 bags at 12 mm and 1:6, about 8.5 bags at 1:4, by the standard arithmetic. UltraTech's plaster page says 1 to 1.5 bags per 100 sq ft, so 10 to 15 bags, because real walls are uneven. The plaster of a whole 1000 sq ft house (inside, outside and ceiling) is about 50 bags by arithmetic.
Area × thickness gives the wet volume. Multiply by 1.54 for concrete or about 1.33 for mortar. Take the cement share of the mix (1 part in 5.5 for M20). Multiply by 1,440 kg and divide by 50 for bags. The calculator does this for each part.
Close to it. Use the built-up area of both floors: 2000 sq ft at 0.35 to 0.42 bag per sq ft is 700 to 840 bags for a brick house. The two floors share one foundation, so the true count is a little lower, but the foundation must be made for two floors. Plan on the range.
0.35 to 0.42 bag per sq ft of built-up area for a brick house with an RCC roof, and 0.4 to 0.5 for an RCC frame, all floors counted.
Your bag count × today's price for the bag you choose, from the cement rate page. Cutting and delivery are charged separately. Cement is only one line of the house budget: cost of a 1000 sq ft house.
Civil engineer at our Reva Road store, Muzaffarpur. He worked out the house on this page part by part on 12 Nov 2026, using UltraTech's published mix figures and standard estimating figures. Where the figures disagree, the page says so and uses the safer one.
We'll count the cement for each stage, with today's price, on WhatsApp. Send photos of the sariya on WhatsApp before dhalai and we'll check them with you.