Delivery
Check whether a truck reaches the plot or only a tractor, and order full loads to cut trips. Cutting and delivery are charged separately; ask for the amount for your site.
A 1000 sq ft house is not one price. An RCC frame takes about twice the sariya of a house whose brick walls carry the lenter, and two floors of 500 cost differently from one floor of 1000. So this page gives the list for your 1000 sq ft at today's rate, not a round figure that fits nobody.
The same number is used for three different things. Get this wrong and the estimate is wrong before the first bag is bought.
25 × 40 ft of land. Leave open space at the front and back and the house is smaller, often 750 to 850 sq ft on one floor. Price the house, not the plot. Room layouts for this plot: 25 × 40 naksha.
Covered area, outside wall to outside wall. Foundation and lenter both cover the full 1000 sq ft. Thekedars quote on this number, and the list below prices it.
Same built-up area, half the foundation and half the roof, but a second slab, a staircase, heavier columns and more outside wall to plaster and paint. Pick it in the list to see what changes.
Carpet area, the floor inside the walls, is about 80% of built-up (standard planning figure). Flats are sold on it. For building your own house, use built-up.
This decides most of the sariya and much of the cement. It is also the one choice you cannot change after the foundation.
| Question about your house | If yes |
|---|---|
| Will an upper floor come in the next few years? | RCC frame, with footings and columns sized for it now |
| Is the plot filled land, soft soil or in a flood area? | RCC frame, with a foundation designed by an engineer |
| Do you want a shop front or a wide hall without walls? | RCC frame |
| One floor for good, firm ground, ordinary room sizes? | Brick walls carrying the slab can work |
Muzaffarpur is in earthquake zone IV (IS 1893). A brick-wall house here needs concrete bands at plinth and lintel, and with an RCC slab the slab itself is the roof band, as IS 4326 lays down for masonry houses in this zone. More on earthquake zone 4; whether a thin slab is enough: is a 4-inch lenter enough.
Choose your structure, floors, plinth and finish. Each line gives a low and a high number from standard planning figures and the makers' coverage. Buy to the high number; your engineer's drawing decides the final order.
Planning figures, not a bill of quantities. Labour, cutting and delivery are separate (delivery). For katha and dhur, a tin roof, G+2 or your own labour quotes, use the full house calculator.
How each line is worked out, figure by figure: house construction cost calculator. Deeper on one material: cement for 1000 sq ft · sariya per sq ft · bricks, counted from your walls · balu and gitti.
Order by stage. Cement kept for months loses strength and sariya left in the rain rusts, so buy each part of the list when the work needs it.
| Stage | What you buy | Worth knowing |
|---|---|---|
| 1 · Neev and plinth | Cement, sariya for footings and the plinth beam or band, bricks, balu, gitti, filling | Anti-termite treatment goes in at this stage: termite treatment. |
| 2 · Columns and walls | Bricks (the biggest single order), cement and balu for mortar, column sariya | A lintel or lintel band over every door and window. |
| 3 · Lenter (roof slab) | About 96 bags for a 5-inch slab over 1000 sq ft, and 1.3–1.4 t of slab sariya; gitti, balu, binding wire, WP+200 | Conduit and pipe sleeves go in before the pour: dhalai checklist · sariya in the slab. |
| 4 · Plaster | Cement and balu; WP+200 in the outside plaster | Wiring and pipe chases are cut before plaster, not after. |
| 5 · Floor, bathroom, wiring | Tiles and tile adhesive, water and drain pipes, wire, sanitaryware | Waterproof the bathroom floor before tiling: bathroom waterproofing. |
| 6 · Putty, primer, paint | WallCare putty, primer, Birla Opus paint inside and out | Plaster cures 28 days and must be dry first: putty, primer, paint. |
Slab figures: cement at 1:1.5:3, as worked on cement for chhat dhalai; slab sariya, standard estimate for a 1000 sq ft roof. Your slab drawing decides both.
We found no reliable published labour rate for Muzaffarpur, so we don't print one. Get two or three quotes for the same work and multiply.
Rate × 1000 sq ft built-up. Ask what it covers: shuttering, scaffolding, curing, shifting material. Two equal rates can cover different work.
Mistri and helper by the day, for small jobs and finishing. Bihar's legal minimum from 1 April 2026 is about ₹436 a day unskilled and ₹551 skilled; market rates are normally higher.
One amount for dhalai day. Ask the gang size, whether the mixer and vibrator are included, and who pays for curing.
How thekedars price a house, and the questions to ask: labour and thekedar rates.
These sit outside the built-up area, so neither the list above nor most online rates include them. Give each its own line in your budget.
Every item, what it involves and how to budget it: what the cost includes and what it doesn't.
Check whether a truck reaches the plot or only a tractor, and order full loads to cut trips. Cutting and delivery are charged separately; ask for the amount for your site.
If water stands on the plot in the rains, raise the plinth first. Set the height in the list above and watch the bricks and filling grow.
Put in the borewell before the foundation. Curing needs water from the first pour.
Masons go home for Chhath and the harvest. Don't plan lenter day then.
A full village house, walls carrying the slab: village brick house cost.
A 25 × 40 plot rarely carries 1000 sq ft of house on one floor. Price the built-up area from your naksha.
Walls and strip foundation built for one floor can't take a second. If a floor is coming, build the frame now.
Boundary wall, borewell, septic tank, doors and sanitary are their own lines. List them before you start.
Two quotes at the same rate per sq ft can cover different work. Compare the scope line by line.
Prices are from our latest bill and change often. Please confirm today's rate on WhatsApp or call before buying.
UltraTech SuperFootings, columns, slab₹ 435per 50 kg bag UltraTech PPCBrickwork, plaster, floor base₹ 330per 50 kg bag UltraTech Weather PlusRoof and damp places₹ 440per 50 kg bagEvery product can be ordered; anything not on the shelf, we order for you, ask on WhatsApp how long it takes. Today's prices: cement · sariya · balu, gitti, eent · all rates.
It is the material list for your structure at today's rate, plus your thekedar's labour rate times 1000 sq ft, plus what sits outside the house (boundary, borewell, septic tank, doors, sanitary). Set your choices in the list on this page and it prices the materials at today's store rate. For the per-sq-ft view, see cost per sq ft in Muzaffarpur.
For the slab alone, a 5-inch lenter over 1000 sq ft in a 1:1.5:3 mix takes about 96 bags of cement (77 at 4 inches, 115 at 6 inches) and about 1.3–1.4 t of sariya. Beams, columns and the rest of the house come on top, and your slab drawing decides the final figure.
25 × 40 = 1000, so the plot is 1000 sq ft of land. The house on it is usually smaller once open space is left at the front and back. Price the built-up area from your naksha.
For one floor that will stay one floor, brick walls carrying the slab: about 1.5–2.2 t of sariya instead of 3.5–4.5 t, and less shuttering. The frame costs more but can take an upper floor. Switch the structure in the list to see both.
Yes, it is common. It needs firm ground, a strip foundation of the right width, concrete bands at plinth and lintel, with the RCC slab itself acting as the roof band (Muzaffarpur is in zone IV), and a mason who knows the wall thickness the roof needs. Ask an engineer if the plot floods or the soil is soft.
Not quite. You save half the foundation and half the roof, but add a second slab, a staircase, heavier columns and more outside wall. Choose two floors in the list to see which lines move.
As a rough planning figure, 8,000–10,000 for an RCC frame and 11,000–13,000 when brick walls carry the slab. The real count comes from your wall lengths and thicknesses: bricks counted wall by wall.
Multiply the length in metres by the standard weight per metre: 6 mm 0.222 kg, 8 mm 0.395, 10 mm 0.617, 12 mm 0.888, 16 mm 1.58. So 100 m of 12 mm bar is 88.8 kg.
Arun Tiwari has run house sites around Muzaffarpur and plans material lists with customers at our Reva Road store. The quantities on this page use the same standard planning figures as our house calculator, and the finishing lines use the makers' own coverage sheets, checked on 13 Nov 2026. Where figures differ, the page uses the higher one so you don't run short.
We'll send back the material list for your 1000 sq ft, stage by stage, with today's price, on WhatsApp. Before lenter day, send photos of the sariya and shuttering and we'll look at them with you.