Chhat dhalai kit: everything for the slab in one order, sized to your roof
- 96 bags cement
- 1.3–1.4 t sariya
- 177 cft balu
- 354 cft gitti
Plus about 14 kg of binding wire, 250 cover blocks and 2,400 litres of mixing water, with WP+200 and a tarpaulin if you want them. Put in your own roof below and the list resizes, bar for bar and bag for bag. It comes in two deliveries: steel a week before, the rest two days before.
Your roof in, the whole order out
Length and width, or the area if you know it, and the thickness from your drawing. Choose the cement and how the steel is drawn. Every line can be switched off, and the WhatsApp button sends the list split into the two deliveries.
Your chhat dhalai kit
Prices are from our latest bill and change often. Please confirm today's rate on WhatsApp or call before buying.
Sariya 10 mm——Ask today's rate per kg · Tata Tiscon or Saluja GoldPlain slab of even thickness. Your engineer's bar list overrides the kit's steel. Prices are filled in from today's rate. Cutting and delivery are charged separately; ask for the amount for your site (delivery). Beams, chhajja or stairs in the same pour: cement, sand and gitti calculator.
Steel a week before, the rest two days before
Lot 1, about a week before. The bars have to be on site early, because the mason needs days to cut, bend and tie the mesh, and you need time to check it before concrete covers it. Bars come as 12 m lengths or cut to your sizes; a 12 m bar does not fit a pickup, so it travels on a longer vehicle (cutting and delivery). Once the mesh is tied, send us photos on WhatsApp before dhalai and we will look at them with you.
Lot 2, about two days before. Cement, balu and gitti arrive with time to count the bags off the truck, stack them on planks under cover and keep the sand off the mud, but not so early that cement sits for a week on a damp site. If the dhalai falls between mid-June and mid-October, book the balu early: river sand mining in Bihar stops in those months (balu rate and the June rise).
What to check in that week, and on the day, is in the chhat dhalai checklist. This page only makes sure nothing on that list is missing from the order.
How each line of the kit is worked out
Each rule is labelled: a standard, a maker's figure, or usual practice on Bihar sites. The full working for cement and steel is on the guide pages linked, so it is not repeated here.
| Line | Rule used | 1000 sq ft, 5 inch |
|---|---|---|
| Cement | M20 at 1:1.5:3, wet volume × 1.54 for dry, one part in 5.5 is cement, 0.0347 m³ a bag. 77, 96 and 115 bags at 4, 5 and 6 inch. Which bag and why: cement for chhat dhalai. Usual practice | 96 bags + 2 |
| Balu, gitti | 1.5 and 3 parts to the cement's one, in cft; trolleys at 100 cft, rounded up to the half. Per stage for the whole house: balu and gitti for 1000 sq ft. Usual practice | 177 + 354 cft |
| Water | At most 25 litres per 50 kg bag, so the mix stays strong; less if the balu is wet. Standard figure | 2,400 L |
| Sariya | Scaled from a 40 × 25 ft roof worked bar by bar: 10 mm at 6 inch both ways = 1,314 kg; 12 mm main at 6 inch with 10 mm at 8 inch = 1,403 kg. Top bars over beams and 10% for laps, bends and cut ends are inside. Weights per metre from IS 1786. Your own spacing: sariya for a roof slab. Standard weights Worked example | 1.3–1.4 t |
| Binding wire | About 1 kg for every quintal of bars. Usual practice | 14–15 kg |
| Chairs | Only if the drawing shows them: about one per square metre under the top bars, each about 0.6 m of 8 mm bar. Usual practice | about 22 kg |
| Cover blocks | 20 mm under the bottom bars (IS 456, inside a house), about one per 4 sq ft. Standard cover Usual spacing | about 250 |
| WP+200 | 200 ml per 50 kg bag, mixed into the second half of the water. Packs of 1, 5, 10 and 20 L. More: waterproofing in the dhalai. UltraTech | 19.2 L, one 20 L can |
The 3.5 to 5 kg of steel per sq ft you see online is for a whole house, footings to roof (JSW Neosteel). For the roof slab alone it would buy about three times too much. Whole-house steel by stage: sariya calculator.
What the kit leaves to the site, and to later
Shuttering, props, mixer, vibrator
The thekedar or shuttering contractor brings or hires them. Book them by date and time, with a spare vibrator needle and fuel for the day.
Conduits, fan boxes, pipe sleeves
They go on the mesh before the pour, from the electrician and plumber's lists: conduit before casting · pipe sleeves in the slab.
Roof coating
Hi-Flex goes on after the slab is cured and dry, weeks later, not on dhalai day: waterproofing in the dhalai.
The rest of the house
Bricks, neev, plaster, paint and fittings, stage by stage: material list for a new house · lenter stage material.
Pick the brand for each line
Cover blocks, a tarpaulin or any size not on the shelf: we can order it for you; ask on WhatsApp for the time it takes. Today's prices: cement · sariya · balu and gitti. All on one GST bill.
Short answers
Dhalai ke liye kya kya chahiye? (What does a slab need from the shop?)
Cement, sariya, binding wire, balu, 20 mm gitti, cover blocks, and if you want them, chairs bent from 8 mm bar, WP+200 for the mix and a tarpaulin in case of rain. Water, shuttering, props, the mixer, the vibrator and the labour come from the site and the thekedar.
How much material for a 1000 sq ft chhat dhalai?
For a 5 inch M20 slab: about 96 bags of cement, 177 cft of balu, 354 cft of gitti and 2,400 litres of mixing water. Sariya about 1.3 tonnes with 10 mm bars or 1.4 tonnes with 12 mm main bars, plus 14 to 15 kg of binding wire and about 250 cover blocks. At 4 inch the cement is about 77 bags, at 6 inch about 115.
Is the kit cheaper than buying each item?
There is no separate kit price. Each item is billed at that day's rate on one GST bill, the same as buying it alone. What the kit saves is a missing item on the day. Cutting and delivery are charged separately; ask for the amount for your site (delivery).
My engineer's bar list gives different steel. Which one do I follow?
The engineer's list. The kit's steel is an estimate scaled from a worked 1000 sq ft roof. Choose "my engineer's bar list" in the kit and send the list on WhatsApp; we weigh out exactly that.
When should the dhalai material reach the site?
In two lots. Sariya, binding wire and cover blocks about a week before, so the steel can be tied and checked. Cement, balu, gitti and WP+200 about two days before, so they can be counted and covered without the cement sitting long on a damp site.
Weather Plus and WP+200 together?
Usually one or the other. Weather Plus is already a water-repellent cement, and UltraTech gives no advice on adding WP+200 to it. With Super or Premium, WP+200 goes in at 200 ml per 50 kg bag (WP+200 per bag).
Where the numbers come from
- Our worked roof: how much sariya for a roof slab (40 × 25 ft, 1,314 kg all 10 mm; 1,403 kg with 12 mm main bars; top bars and 10% allowance included).
- Bureau of Indian Standards, IS 1786:2008: nominal mass from 0.00785 kg per mm² per metre (10 mm 0.617 kg/m, 12 mm 0.888 kg/m, 8 mm 0.395 kg/m).
- Bureau of Indian Standards, IS 456:2000: M20 the lowest grade for RCC (Table 5), 20 mm nominal cover for mild exposure (Table 16). Water at most 25 L per 50 kg bag, the standard figure used across this site.
- UltraTech, Weather Pro waterproofing brochure: WP+200 at 200 ml per 50 kg bag, added with the second half of the water.
- JSW Neosteel, How much steel is required for a house?: 3.5–5 kg per sq ft of built-up area, a whole-house figure.
- Usual practice, labelled where used: 1:1.5:3 with a 1.54 dry factor, 2 spare bags, 1 kg binding wire per quintal, cover blocks on a 2 ft grid, chairs about 1 m apart, a 100 cft trolley.
Send your roof size and dhalai date
We'll send back the kit with today's price, and book the two deliveries for your site.