Split the budget this way and you can see which part you control, which part the market controls, and which part your plot decides.
1Structure
Cement, sariya, eent, balu, gitti and shuttering, from footing to lenter. It follows the day's rate, so it is the block to price on the day you buy, not from last year's figure.
Moves with: floors, slab span, the day's rate
2Finishing
Plaster, putty, paint, tiles, doors and windows. The same plan can be finished in cement floor and distemper or in vitrified tiles and washable paint. This is the block that runs out of money when the budget was made for the structure only.
Moves with: your choices, not the plan
3Services
Water pipes and drainage, wiring and switches, bathroom fittings, the roof tank. Count bathrooms and electrical points and this block is easy to price.
Moves with: bathrooms, number of points
4Labour
Masons and helpers, bar-bending, shuttering, then plumber, electrician, tile mistri and painter. We print no market rate: get two written labour-only quotes for the same scope.
Moves with: how you hire, who supervises
5Bihar extras
Boundary wall and gate, earth filling under a raised plinth, borewell and pump, septic tank and soak pit, connections and the naksha fee. They are outside the drawing, so they are outside most quotes.
Moves with: plot level, water table, road
+Reserve
Rates move during the months of work, and something always turns up on site. Keep about a tenth of the total aside and don't count it as spent until the house is done.
Usual practice: 10%